Tap Water/water Supply Well Sampling and Well Survey Update Report
Title | Tap Water/water Supply Well Sampling and Well Survey Update Report PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 2006 |
Genre | Groundwater |
ISBN |
Water Supply Well Sampling
Title | Water Supply Well Sampling PDF eBook |
Author | ARCADIS Geraghty & Miller, Inc |
Publisher | |
Pages | |
Release | 2000 |
Genre | Hazardous waste site remediation |
ISBN |
Non-transient, Non-community Water Systems
Title | Non-transient, Non-community Water Systems PDF eBook |
Author | |
Publisher | |
Pages | 12 |
Release | 1995 |
Genre | Drinking water |
ISBN |
Primer on Well Water Sampling for Volatile Organic Compounds
Title | Primer on Well Water Sampling for Volatile Organic Compounds PDF eBook |
Author | Patrick W. Holden |
Publisher | |
Pages | 56 |
Release | 1985 |
Genre | Groundwater |
ISBN |
A Guide to the Selection of Materials for Monitoring Well Construction and Ground-water Sampling
Title | A Guide to the Selection of Materials for Monitoring Well Construction and Ground-water Sampling PDF eBook |
Author | Michael J. Barcelona |
Publisher | |
Pages | 92 |
Release | 1983 |
Genre | Groundwater |
ISBN |
Contaminated Water Supplies at Camp Lejeune
Title | Contaminated Water Supplies at Camp Lejeune PDF eBook |
Author | National Research Council |
Publisher | National Academies Press |
Pages | 338 |
Release | 2009-09-06 |
Genre | Medical |
ISBN | 0309136997 |
In the early 1980s, two water-supply systems on the Marine Corps Base Camp Lejeune in North Carolina were found to be contaminated with the industrial solvents trichloroethylene (TCE) and perchloroethylene (PCE). The water systems were supplied by the Tarawa Terrace and Hadnot Point watertreatment plants, which served enlisted-family housing, barracks for unmarried service personnel, base administrative offices, schools, and recreational areas. The Hadnot Point water system also served the base hospital and an industrial area and supplied water to housing on the Holcomb Boulevard water system (full-time until 1972 and periodically thereafter). This book examines what is known about the contamination of the water supplies at Camp Lejeune and whether the contamination can be linked to any adverse health outcomes in former residents and workers at the base.
Plans and Practices for Groundwater Protection at the Los Alamos National Laboratory
Title | Plans and Practices for Groundwater Protection at the Los Alamos National Laboratory PDF eBook |
Author | National Research Council |
Publisher | National Academies Press |
Pages | 104 |
Release | 2007-10-18 |
Genre | Nature |
ISBN | 0309106192 |
The world's first nuclear bomb was a developed in 1954 at a site near the town of Los Alamos, New Mexico. Designated as the Los Alamos National Laboratory (LANL) in 1981, the 40-square-mile site is today operated by Log Alamos National Security LLC under contract to the National Nuclear Security Administration (NNSA) of the U.S. Department of Energy (DOE). Like other sites in the nation's nuclear weapons complex, the LANL site harbors a legacy of radioactive waste and environmental contamination. Radioactive materials and chemical contaminants have been detected in some portions of the groundwater beneath the site. Under authority of the U.S. Environmental Protection Agency, the State of New Mexico regulates protection of its water resources through the New Mexico Environment Department (NMED). In 1995 NMED found LANL's groundwater monitoring program to be inadequate. Consequently LANL conducted a detailed workplan to characterize the site's hydrogeology in order to develop an effective monitoring program. The study described in Plans and Practices for Groundwater Protection at the Los Alamos National Laboratory: Final Report was initially requested by NNSA, which turned to the National Academies for technical advice and recommendations regarding several aspects of LANL's groundwater protection program. The DOE Office of Environmental Management funded the study. The study came approximately at the juncture between completion of LANL's hydrogeologic workplan and initial development of a sitewide monitoring plan.