Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57).

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57).
Title Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57). PDF eBook
Author
Publisher
Pages 11
Release 2002
Genre
ISBN

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57). Book in PDF, Epub and Kindle

Vegetation Management along the Trojan-Allston Transmission Lines 1 & 2 ROW between 1/1 and 9/1. The lines are 230 kV Single Circuit Transmission Lines having an easement width of 125 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43).

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43).
Title Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43). PDF eBook
Author
Publisher
Pages 2
Release 2002
Genre
ISBN

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43). Book in PDF, Epub and Kindle

Vegetation Management along the Lower Monumental - McNary 57/2 to 63/5, and Radar Tap 0/4 to 0/10 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 165 and 80 feet respectively. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines and access roads, including Reclaim and Danger Trees. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National Electrical Safety Code and BPA standards. A follow-up herbicide treatment will occur following the initial entry to eliminate re-sprouting noxious weeds and tall-growing species along access roads and tower sites.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 75-Ross-Lexington

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 75-Ross-Lexington
Title Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 75-Ross-Lexington PDF eBook
Author
Publisher
Pages 17
Release 2002
Genre
ISBN

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 75-Ross-Lexington Book in PDF, Epub and Kindle

BPA proposes to remove danger trees as well as unwanted vegetation in the rights-of-ways, along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-112 Ross-Alcoa 1 & 2, 3 & 4 and Bonneville Alcoa 1 & 2).

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-112 Ross-Alcoa 1 & 2, 3 & 4 and Bonneville Alcoa 1 & 2).
Title Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-112 Ross-Alcoa 1 & 2, 3 & 4 and Bonneville Alcoa 1 & 2). PDF eBook
Author
Publisher
Pages 17
Release 2002
Genre
ISBN

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-112 Ross-Alcoa 1 & 2, 3 & 4 and Bonneville Alcoa 1 & 2). Book in PDF, Epub and Kindle

Vegetation Management for portions of the Ross-Alcoa transmission lines 230kV & 115kV and Bonneville-Alcoa 115kV.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-127- Eugene-Alvey#2

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-127- Eugene-Alvey#2
Title Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-127- Eugene-Alvey#2 PDF eBook
Author
Publisher
Pages 11
Release 2003
Genre
ISBN

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-127- Eugene-Alvey#2 Book in PDF, Epub and Kindle

BPA proposes to remove unwanted vegetation along the right-of-way, access roads, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Vegetation Management for the Eugene-Alvey 115 kV transmission line from structure 7/1 through structure 12/2m, and along portions of the following adjacent transmission lines: Hawkins-Alvey 115KV and Alvey-Lane 115KV.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-126- Alvey Fairview

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-126- Alvey Fairview
Title Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-126- Alvey Fairview PDF eBook
Author
Publisher
Pages 16
Release 2003
Genre
ISBN

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-126- Alvey Fairview Book in PDF, Epub and Kindle

BPA proposes to remove unwanted vegetation along the right-of-way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Vegetation Management for the Alvey Fairview 230kV transmission line from structure 1/1 through structure 64/7.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-144-Custer-Intalco #2).

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-144-Custer-Intalco #2).
Title Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-144-Custer-Intalco #2). PDF eBook
Author
Publisher
Pages 13
Release 2003
Genre
ISBN

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-144-Custer-Intalco #2). Book in PDF, Epub and Kindle

BPA proposes to clear targeted vegetation within the right-of-way, along access roads and around towers that may impede the operation and maintenance of the subject transmission lines.