Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40) - Allston-Keeler 500 KV Transmission Line

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40) - Allston-Keeler 500 KV Transmission Line
Title Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40) - Allston-Keeler 500 KV Transmission Line PDF eBook
Author
Publisher
Pages 18
Release 2002
Genre
ISBN

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40) - Allston-Keeler 500 KV Transmission Line Book in PDF, Epub and Kindle

Vegetation Management along the Allston-Keeler 500 kV Transmission Line ROW exclusive to BLM lands between 8/4 through 27/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 150 feet. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines and access roads, including Reclaim and Danger Trees. The lands in this SA are administered by BLM. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National Electrical Safety Code and BPA standards. Work is to begin in March 2002. In accordance with a court injunction, no chemical treatment is planned on BLM lands.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-221) Project #

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-221) Project #
Title Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-221) Project # PDF eBook
Author
Publisher
Pages 3
Release 2004
Genre
ISBN

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-221) Project # Book in PDF, Epub and Kindle

The project activities will be conducted along the Right-of-Way (ROW) of the Paul-Allston No 1 and 2 - 500 kV transmission line corridor between towers 45/4 and the Allston substation. This corridor includes portions of the Longview-Allston No 1 and 2 and the Longview-Allston No 3 and 4 - 230 kV transmission lines. The corridor along this section of the proposed project varies between 125 and 150 feet in width and crosses approximately 4 miles of terrain from Longview, Washington crossing the Columbia River and passing through rural forestland and pasture lands to the Allston Substation in Oregon. BPA proposes to remove unwanted vegetation along the right-of-way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-222).

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-222).
Title Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-222). PDF eBook
Author
Publisher
Pages 9
Release 2004
Genre
ISBN

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-222). Book in PDF, Epub and Kindle

Vegetation Management along the St. John's - Keeler 115 kV Transmission Line Corridor from 3/1 to 10/6. This corridor includes portions of the Oregon City - Keeler No 2 115 kV transmission line. The corridor along this section of the proposed project is 100 feet in width.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2).

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2).
Title Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2). PDF eBook
Author
Publisher
Pages 10
Release 2003
Genre
ISBN

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2). Book in PDF, Epub and Kindle

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon #2). Bonneville Power Administration proposes to remove vegetation alongside Transmission Right-of-Ways.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-130- Keeler-Tillamook).

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-130- Keeler-Tillamook).
Title Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-130- Keeler-Tillamook). PDF eBook
Author
Publisher
Pages 12
Release 2003
Genre
ISBN

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-130- Keeler-Tillamook). Book in PDF, Epub and Kindle

Vegetation Management for the Keeler Tillamook 115 kV transmission line from structure 1/7 through structure 58/2, and along adjacent portions of the Keeler-Forest Grove #2 115KV transmission line. In addition the project includes 11miles of the 115KV Timber Tap.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57).

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57).
Title Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57). PDF eBook
Author
Publisher
Pages 11
Release 2002
Genre
ISBN

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57). Book in PDF, Epub and Kindle

Vegetation Management along the Trojan-Allston Transmission Lines 1 & 2 ROW between 1/1 and 9/1. The lines are 230 kV Single Circuit Transmission Lines having an easement width of 125 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25) - Ostrander-Pearl Transmission Line

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25) - Ostrander-Pearl Transmission Line
Title Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25) - Ostrander-Pearl Transmission Line PDF eBook
Author
Publisher
Pages 3
Release 2001
Genre
ISBN

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25) - Ostrander-Pearl Transmission Line Book in PDF, Epub and Kindle

Vegetation Management along selected ROW sections of the Ostrander-Pearl transmission line. The ROWs include sections of the Ostrander-Pearl 500 kV line; the Ostrander-McLoughlin 500 kV line; the Big Eddy-Chemawa 230 kV line and the Big Eddy-McLoughlin 230 kV line. BPA proposes to clear unwanted vegetation in the rights-of-way and around tower structures that may impede the operation and maintenance of the subject transmission lines. The project also includes clearing approximately 3 miles of access road and cutting of some danger trees. All work will be in accordance with the National Electrical Safety Code and BPA Standards. BPA plans to conduct vegetation control with the goal of removing tall-growing vegetation that is currently or will soon be a hazard to the transmission lines and to promote low-growing plant communities in the right-of-way and to clear vegetation from new rights-of-way corridors.