Revised Record of Decision for the Electrical Interconnection of the Summit

Revised Record of Decision for the Electrical Interconnection of the Summit
Title Revised Record of Decision for the Electrical Interconnection of the Summit PDF eBook
Author
Publisher
Pages 8
Release 2004
Genre
ISBN

Download Revised Record of Decision for the Electrical Interconnection of the Summit Book in PDF, Epub and Kindle

The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. In order to deliver power to this location, CPUD would develop a new substation (Bradbury Substation) at a site near the Project and a new 230-kV transmission line from there to CPUD's Wauna Substation, which is already connected to the FCRTS. As part of this revised decision, BPA will facilitate CPUD development of the Bradbury-Wauna transmission line by allowing joint use of BPA right-of-way. This will involve reconstructing a section of BPA's 115-kV Allston-Astoria No. 1 transmission line from single-circuit H-frame wood-pole design to double-circuit single metal pole design. Terms of BPA participation in CPUD's development of the Bradbury-Wauna transmission line will be documented in a Construction Agreement. This optional interconnection plan is in addition to BPA's previous offer for interconnection of the Project at BPA's Allston Substation, as documented in the July 25, 2003, ROD. As with the initial interconnection plan, the decision to offer terms to interconnect the Project through the optional interconnection plan is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 1995). This decision thus is similarly tiered to the Business Plan ROD.

Record of Decision for the Electrical Interconnection of the COB Energy Facility (DOE

Record of Decision for the Electrical Interconnection of the COB Energy Facility (DOE
Title Record of Decision for the Electrical Interconnection of the COB Energy Facility (DOE PDF eBook
Author
Publisher
Pages 4
Release 2004
Genre
ISBN

Download Record of Decision for the Electrical Interconnection of the COB Energy Facility (DOE Book in PDF, Epub and Kindle

The COB Energy Facility would be constructed on a site near the rural community of Bonanza, in Klamath County, Oregon. Generating components of the project would be constructed in either one or two phases, including four air-cooled combustion turbine generators fueled with natural gas, four heat recovery steam generators, and two steam turbines. Additional facilities include a new 7.2-mile-long 500-kV transmission line, a new 4.1-mile-long natural gas pipeline, a 2.8-mile-long water pipeline, a 20-acre wastewater evaporation pond or a 3,770-foot-long irrigation pipeline to deliver wastewater to a 31-acre pasture, a 4.7-acre stormwater infiltration basin, a 1.5-acre stormwater retention pond, and various tanks, buildings, exhaust stacks, parking, and storage areas. Natural gas to fuel the combustion turbines would be supplied by way of a new 4.1-mile-long, 20-inch-diameter pipeline from a Gas Transmission Northwest's Bonanza Compressor Station. The new pipeline would be constructed within private easements adjacent to or near Klamath County road rights-of-way. Although COB Energy Facility generators would use air-cooled condensers, the project would use an average of 72 gallons per minute for steam production and station service, up to a maximum of 210 gallons per minute. The source of this water would be one existing and two new wells near the project site, drawing from a deep aquifer consistent with a State of Oregon water right permit expected to be incorporated into the State energy facility site certificate. Process wastewater would either be used to irrigate pasture or held in a lined pond to evaporate. Sanitary water would be routed to an onsite septic tank then discharged to a leach field. No wastewater would be discharged to surface waters. The COB Energy Facility would interconnect to the FCRTS at Captain Jack Substation, 7.2 miles south of the project site. PERC would construct a new 500-kV transmission line from the project site to Captain Jack Substation. Part of the transmission line would cross public land managed by the Bureau of Land Management. BPA would install additional electrical equipment at Captain Jack Substation. At this time, PERC has not requested specific points of delivery.

Record of Decision, APS/SDG & E Interconnection Project

Record of Decision, APS/SDG & E Interconnection Project
Title Record of Decision, APS/SDG & E Interconnection Project PDF eBook
Author Clair M. Whitlock
Publisher
Pages 8
Release 1981
Genre Electric power transmission
ISBN

Download Record of Decision, APS/SDG & E Interconnection Project Book in PDF, Epub and Kindle

Weekly Reports and Index Containing Decisions, Opinions and Rulings for New York State Departments, Commissions and Courts

Weekly Reports and Index Containing Decisions, Opinions and Rulings for New York State Departments, Commissions and Courts
Title Weekly Reports and Index Containing Decisions, Opinions and Rulings for New York State Departments, Commissions and Courts PDF eBook
Author
Publisher
Pages 1102
Release 1918
Genre New York (State)
ISBN

Download Weekly Reports and Index Containing Decisions, Opinions and Rulings for New York State Departments, Commissions and Courts Book in PDF, Epub and Kindle

Record of Decision

Record of Decision
Title Record of Decision PDF eBook
Author
Publisher
Pages 27
Release 1989*
Genre
ISBN

Download Record of Decision Book in PDF, Epub and Kindle

Federal Register

Federal Register
Title Federal Register PDF eBook
Author
Publisher
Pages 316
Release 2013-12
Genre Delegated legislation
ISBN

Download Federal Register Book in PDF, Epub and Kindle

APS/SDG & E Interconnection Project

APS/SDG & E Interconnection Project
Title APS/SDG & E Interconnection Project PDF eBook
Author United States. Bureau of Land Management
Publisher
Pages 4
Release 1982
Genre Electric power transmission
ISBN

Download APS/SDG & E Interconnection Project Book in PDF, Epub and Kindle