Remedial Investigation Report for J-Field, Aberdeen Proving Ground, Maryland. Volume 3
Title | Remedial Investigation Report for J-Field, Aberdeen Proving Ground, Maryland. Volume 3 PDF eBook |
Author | |
Publisher | |
Pages | 651 |
Release | 2000 |
Genre | |
ISBN |
The Environmental Management Division of the U.S. Army Aberdeen Proving Ground (APG), Maryland, is conducting a remedial investigation (RI) and feasibility study (FS) of the J-Field area at APG, pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of that activity, Argonne National Laboratory (ANL) conducted an ecological risk assessment (ERA) of the J-Field site. This report presents the results of that assessment.
Tsjechisch (Kosmos taalgids. Wat en hoe).
Title | Tsjechisch (Kosmos taalgids. Wat en hoe). PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 19?? |
Genre | |
ISBN |
Remedial Investigation Work Plan for J-Field, Aberdeen Proving Ground, Maryland
Title | Remedial Investigation Work Plan for J-Field, Aberdeen Proving Ground, Maryland PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1995 |
Genre | |
ISBN |
Remedial Investigation Sampling and Analysis Plan for J-Field, Aberdeen Proving Ground, Maryland: Volume 2, Quality Assurance Project Plan
Title | Remedial Investigation Sampling and Analysis Plan for J-Field, Aberdeen Proving Ground, Maryland: Volume 2, Quality Assurance Project Plan PDF eBook |
Author | |
Publisher | |
Pages | 0 |
Release | 1995 |
Genre | |
ISBN |
Voprosy partiĭnogo stroitelʹstva
Title | Voprosy partiĭnogo stroitelʹstva PDF eBook |
Author | |
Publisher | |
Pages | 253 |
Release | 1972 |
Genre | |
ISBN |
Water-resources Investigations Report
Title | Water-resources Investigations Report PDF eBook |
Author | |
Publisher | |
Pages | 208 |
Release | 1996 |
Genre | Hydrology |
ISBN |
Remedial Investigation Addendum Report Data Item A009. Volume 4: Appendices I-Z.
Title | Remedial Investigation Addendum Report Data Item A009. Volume 4: Appendices I-Z. PDF eBook |
Author | |
Publisher | |
Pages | 539 |
Release | 1993 |
Genre | |
ISBN |
The U.S. Army Environmental Center (USAEC) directed ABB Environmental Services, Inc. (ABB-ES), under Contract No. DAAA15-91-D-0008, to collect environmental samples at Fort Devens, Massachusetts to fill data gaps identified during initiation of the Feasibility Study (FS) for Group 1A sites. The Group 1A sites include the Shepley's Hill Landfill and Cold Spring Brook Landfill at Fort Devens. This Remedial Investigation (RI) Addendum report summarizes the supplemental field investigations, presents the data obtained, and updates the baseline risk assessment prepared for the RI report. Field investigation programs were conducted between September 1992 and July 1993 and included collecting and analyzing of sediment core samples from Plow Shop and Cold Spring Brook ponds, collecting and analyzing fish tissue samples from these two ponds, and conducting a macroinvertebrate study of the two ponds. In addition, several new monitoring wells were installed and groundwater samples were collected for analysis from 27 monitoring wells at Shepley's Hill Landfill and from 10 monitoring wells at Cold Spring Brook Landfill. Soil, sediment, and groundwater samples were also collected from several other areas, including Nonacoicus Brook Wetland and Grove Pond adjacent to Shepley's Hill Landfill, and the Magazine Area adjacent to Cold Spring Brook Landfill.