Recommendation of Low-level Radioactive Waste Isolation Facility

Recommendation of Low-level Radioactive Waste Isolation Facility
Title Recommendation of Low-level Radioactive Waste Isolation Facility PDF eBook
Author Michigan Low-Level Radioactive Waste Authority. Sitting Criteria Advisory Committee
Publisher
Pages
Release 1988
Genre Radioactive waste disposal
ISBN

Download Recommendation of Low-level Radioactive Waste Isolation Facility Book in PDF, Epub and Kindle

Improving Operations and Long-Term Safety of the Waste Isolation Pilot Plant

Improving Operations and Long-Term Safety of the Waste Isolation Pilot Plant
Title Improving Operations and Long-Term Safety of the Waste Isolation Pilot Plant PDF eBook
Author National Research Council
Publisher National Academies Press
Pages 156
Release 2001-06-11
Genre Science
ISBN 0309183138

Download Improving Operations and Long-Term Safety of the Waste Isolation Pilot Plant Book in PDF, Epub and Kindle

The Waste Isolation Pilot Plant (WIPP) is a deep underground mined facility for the disposal of transuranic waste resulting from the nation's defense program. Transuranic waste is defined as waste contaminated with transuranic radionuclides with half-life greater than 20 years and activity greater than 100 nanocuries per gram. The waste mainly consists of contaminated protective clothing, rags, old tools and equipment, pieces of dismantled buildings, chemical residues, and scrap materials. The total activity of the waste expected to be disposed at the WIPP is estimated to be approximately 7 million curies, including 12,900 kilograms of plutonium distributed throughout the waste in very dilute form. The WIPP is located near the community of Carlsbad, in southeastern New Mexico. The geological setting is a 600-meter thick, 250 million-year-old saltbed, the Salado Formation, lying 660 meters below the surface. The National Research Council (NRC) has been providing the U.S. Department of Energy (DOE) scientific and technical evaluations of the WIPP since 1978. The committee's task is twofold: (1) to identify technical issues that can be addressed to enhance confidence in the safe and long-term performance of the repository and (2) to identify opportunities for improving the National Transuranic (TRU) Program for waste management, especially with regard to the safety of workers and the public. This is the first full NRC report issued following the certification of the facility by the U.S. Environmental Protection Agency (EPA) on May 18, 1998. An interim report was issued by the committee in April 2000 and is reproduced in this report. The main findings and recommendations from the interim report have been incorporated into the body of this report. The overarching finding and recommendation of this report is that the activity that would best enhance confidence in the safe and long-term performance of the repository is to monitor critical performance parameters during the long pre-closure phase of repository operations (35 to possibly 100 years). Indeed, in the first 50 to 100 years the rates of important processes such as salt creep, brine inflow (if any), and microbial activity are predicted to be the highest and will be less significant later. The committee recommends that the results of the on-site monitoring program be used to improve the performance assessment for recertification purposes. These results will determine whether the need for a new performance assessment is warranted. For the National TRU Program, the committee finds that the DOE is implementing many of the recommendations of its interim report. It is important that the DOE continue its efforts to improve the packaging, characterization, and transportation of the transuranic waste.

Licensing an Assured Isolation Facility for Low-level Radioactive Waste. Volume 2

Licensing an Assured Isolation Facility for Low-level Radioactive Waste. Volume 2
Title Licensing an Assured Isolation Facility for Low-level Radioactive Waste. Volume 2 PDF eBook
Author
Publisher
Pages 250
Release 1998
Genre
ISBN

Download Licensing an Assured Isolation Facility for Low-level Radioactive Waste. Volume 2 Book in PDF, Epub and Kindle

This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application.

Nuclear Waste

Nuclear Waste
Title Nuclear Waste PDF eBook
Author DIANE Publishing Company
Publisher DIANE Publishing
Pages 74
Release 1996-10
Genre Technology & Engineering
ISBN 9780788133985

Download Nuclear Waste Book in PDF, Epub and Kindle

In 1998, the U.S. Department of Energy (DoE) plans to begin a $19 billion program to dispose of 176,000 c.m. of transuranic waste that will be permanently stored in the Waste Isolation Pilot Plant (WIPP), a repository near Carlsbad, NM. However, DoE must first obtain from EPA a certificate of compliance with its disposal regulations for radioactive waste and meet the requirements of RCRA for handling and disposing of hazardous waste. This report assesses the prospects for opening WIPP and determines how well DoE is positioned to begin filling it in the first few years of operation and longer.

Waste Isolation Pilot Plant

Waste Isolation Pilot Plant
Title Waste Isolation Pilot Plant PDF eBook
Author United States. Congress. House. Committee on Armed Services. Procurement and Military Nuclear Systems Subcommittee
Publisher
Pages 60
Release 1979
Genre Government publications
ISBN

Download Waste Isolation Pilot Plant Book in PDF, Epub and Kindle

Report to the President by the Interagency Review Group on Nuclear Waste Management

Report to the President by the Interagency Review Group on Nuclear Waste Management
Title Report to the President by the Interagency Review Group on Nuclear Waste Management PDF eBook
Author United States. Interagency Review Group on Nuclear Waste Management
Publisher
Pages 204
Release 1978
Genre Nuclear facilities
ISBN

Download Report to the President by the Interagency Review Group on Nuclear Waste Management Book in PDF, Epub and Kindle

Licensing an Assured Isolation Facility for Low-level Radioactive Waste. Volume 1

Licensing an Assured Isolation Facility for Low-level Radioactive Waste. Volume 1
Title Licensing an Assured Isolation Facility for Low-level Radioactive Waste. Volume 1 PDF eBook
Author
Publisher
Pages 29
Release 1998
Genre
ISBN

Download Licensing an Assured Isolation Facility for Low-level Radioactive Waste. Volume 1 Book in PDF, Epub and Kindle

This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application.