PUREX Plant Deactivation Function Analysis Report

PUREX Plant Deactivation Function Analysis Report
Title PUREX Plant Deactivation Function Analysis Report PDF eBook
Author
Publisher
Pages 33
Release 1995
Genre
ISBN

Download PUREX Plant Deactivation Function Analysis Report Book in PDF, Epub and Kindle

The document contains the functions, function definitions, function interfaces, function interface definitions, Input Computer Automated Manufacturing Definition (IDEFO) diagrams, and a function hierarchy chart that describe what needs to be performed to deactivate PUREX.

PUREX Plant Deactivation Mission Analysis Report

PUREX Plant Deactivation Mission Analysis Report
Title PUREX Plant Deactivation Mission Analysis Report PDF eBook
Author
Publisher
Pages
Release 1995
Genre
ISBN

Download PUREX Plant Deactivation Mission Analysis Report Book in PDF, Epub and Kindle

The Office of Environmental Management Technical Reports

The Office of Environmental Management Technical Reports
Title The Office of Environmental Management Technical Reports PDF eBook
Author
Publisher
Pages 972
Release 1997
Genre Environmental management
ISBN

Download The Office of Environmental Management Technical Reports Book in PDF, Epub and Kindle

PUREX/UO3 Facilities Deactivation Lessons Learned History

PUREX/UO3 Facilities Deactivation Lessons Learned History
Title PUREX/UO3 Facilities Deactivation Lessons Learned History PDF eBook
Author
Publisher
Pages 236
Release 1996
Genre
ISBN

Download PUREX/UO3 Facilities Deactivation Lessons Learned History Book in PDF, Epub and Kindle

Disconnecting the criticality alarm permanently in June 1996 signified that the hazards in the PUREX (plutonium-uranium extraction) plant had been so removed and reduced that criticality was no longer a credible event. Turning off the PUREX criticality alarm also marked a salient point in a historic deactivation project, 1 year before its anticipated conclusion. The PUREX/UO3 Deactivation Project began in October 1993 as a 5-year, $222.5- million project. As a result of innovations implemented during 1994 and 1995, the project schedule was shortened by over a year, with concomitant savings. In 1994, the innovations included arranging to send contaminated nitric acid from the PUREX Plant to British Nuclear Fuels, Limited (BNFL) for reuse and sending metal solutions containing plutonium and uranium from PUREX to the Hanford Site tank farms. These two steps saved the project $36.9- million. In 1995, reductions in overhead rate, work scope, and budget, along with curtailed capital equipment expenditures, reduced the cost another $25.6 million. These savings were achieved by using activity-based cost estimating and applying technical schedule enhancements. In 1996, a series of changes brought about under the general concept of r̀̀eengineering ̀̀reduced the cost approximately another $15 million, and moved the completion date to May 1997. With the total savings projected at about $75 million, or 33.7 percent of the originally projected cost, understanding how the changes came about, what decisions were made, and why they were made becomes important. At the same time sweeping changes in the cultural of the Hanford Site were taking place. These changes included shifting employee relations and work structures, introducing new philosophies and methods in maintaining safety and complying with regulations, using electronic technology to manage information, and, adopting new methods and bases for evaluating progress. Because these changes helped generate cost savings and were accompanied by and were an integral part of sweeping c̀̀ulture changes, ̀̀the story of the lessons learned during the PUREX Deactivation Project are worth recounting. Foremost among the lessons is recognizing the benefits of r̀̀ight to left ̀̀project planning. A deactivation project must start by identifying its end points, then make every task, budget, and organizational decision based on reaching those end points. Along with this key lesson is the knowledge that project planning and scheduling should be tied directly to costing, and the project status should be checked often (more often than needed to meet mandated reporting requirements) to reflect real-time work. People working on a successful project should never be guessing about its schedule or living with a paper schedule that does not represent the actual state of work. Other salient lessons were learned in the PUREX/UO3 Deactivation Project that support these guiding principles. They include recognizing the value of independent review, teamwork, and reengineering concepts; the need and value of cooperation between the DOE, its contractors, regulators, and stakeholders; and the essential nature of early and ongoing communication. Managing a successful project also requires being willing to take a fresh look at safety requirements and to apply them in a streamlined and sensible manner to deactivating facilities; draw on the enormous value of resident knowledge acquired by people over years and sometimes decades of working in old plants; and recognize the value of bringing in outside expertise for certain specialized tasks. This approach makes possible discovering the savings that can come when many creative options are pursued persistently and the wisdom of leaving some decisions to the future. The essential job of a deactivation project is to place a facility in a safe, stable, low-maintenance mode, for an interim period. Specific end points are identified to recognize and document this state. Keeping the limited objectives of the project in mind can guide decisions that reduce risks with minimal manipulation of physical materials, minimal waste generation, streamline regulations and safety requirements where possible, and separate the facility from ongoing entanglements with operating systems. Thus, the p̀̀arked car ̀̀state is achieved quickly and directly. The PUREX Deactivation Lessons Learned History was first issued in January 1995. Since then, several key changes have occurred in the project, making it advisable to revise and update the document. This document is organized with the significant lessons learned captured at the end of each section, and then recounted in Section 11.0, L̀̀essons Consolidated. ̀̀It is hoped and believed that the lessons learned on the PUREX Deactivation Project will have value to other facilities both inside and outside the DOE complex.

Der Reisende

Der Reisende
Title Der Reisende PDF eBook
Author
Publisher
Pages 204
Release 1782
Genre
ISBN

Download Der Reisende Book in PDF, Epub and Kindle

Plutonium Uranium Extraction (PUREX) End State Basis for Interim Operation (BIO) for Surveillance and Maintenance

Plutonium Uranium Extraction (PUREX) End State Basis for Interim Operation (BIO) for Surveillance and Maintenance
Title Plutonium Uranium Extraction (PUREX) End State Basis for Interim Operation (BIO) for Surveillance and Maintenance PDF eBook
Author
Publisher
Pages 122
Release 1999
Genre
ISBN

Download Plutonium Uranium Extraction (PUREX) End State Basis for Interim Operation (BIO) for Surveillance and Maintenance Book in PDF, Epub and Kindle

This Basis for Interim Operation (BIO) was developed for the PUREX end state condition following completion of the deactivation project. The deactivation project has removed or stabilized the hazardous materials within the facility structure and equipment to reduce the hazards posed by the facility during the surveillance and maintenance (S and M) period, and to reduce the costs associated with the S and M. This document serves as the authorization basis for the PUREX facility, excluding the storage tunnels, railroad cut, and associated tracks, for the deactivated end state condition during the S and M period. The storage tunnels, and associated systems and areas, are addressed in WHC-SD-HS-SAR-001, Rev. 1, PUREX Final Safety Analysis Report. During S and M, the mission of the facility is to maintain the conditions and equipment in a manner that ensures the safety of the workers, environment, and the public. The S and M phase will continue until the final decontamination and decommissioning (D and D) project and activities are begun. Based on the methodology of DOE-STD-1027-92, Hazards Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports, the final facility hazards category is identified as hazards category This considers the remaining material inventories, form and distribution of the material, and the energies present to initiate events of concern. Given the current facility configuration, conditions, and authorized S and M activities, there are no operational events identified resulting in significant hazard to any of the target receptor groups (e.g., workers, public, environment). The only accident scenarios identified with consequences to the onsite co-located workers were based on external natural phenomena, specifically an earthquake. The dose consequences of these events are within the current risk evaluation guidelines and are consistent with the expectations for a hazards category 2 facility.

PUREX/UO[sub 3] Deactivation Project Management Plan

PUREX/UO[sub 3] Deactivation Project Management Plan
Title PUREX/UO[sub 3] Deactivation Project Management Plan PDF eBook
Author
Publisher
Pages
Release 2005
Genre
ISBN

Download PUREX/UO[sub 3] Deactivation Project Management Plan Book in PDF, Epub and Kindle

From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO[sub 3]) Plant, which converted the PUREX liquid uranium nitrate product to solid UO[sub 3] powder. Final UO[sub 3] Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO[sub 3] Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retained during the post-deactivation period. The PUREX/UO[sub 3] Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.