Preliminary Analysis of Projected Construction Employment Effects of Building the Defense Waste Processing Facility at the Savannah River Plant
Title | Preliminary Analysis of Projected Construction Employment Effects of Building the Defense Waste Processing Facility at the Savannah River Plant PDF eBook |
Author | |
Publisher | |
Pages | 0 |
Release | 1981 |
Genre | Radioactive waste disposal |
ISBN |
Savannah River Plant, Defense Waste Processing Facility
Title | Savannah River Plant, Defense Waste Processing Facility PDF eBook |
Author | |
Publisher | |
Pages | 498 |
Release | 1982 |
Genre | |
ISBN |
Defense waste processing facility, Savannah River plant, Aiken, S.C.
Title | Defense waste processing facility, Savannah River plant, Aiken, S.C. PDF eBook |
Author | |
Publisher | |
Pages | 600 |
Release | 1981 |
Genre | |
ISBN |
Energy Abstracts for Policy Analysis
Title | Energy Abstracts for Policy Analysis PDF eBook |
Author | |
Publisher | |
Pages | 858 |
Release | 1981 |
Genre | Power resources |
ISBN |
Energy Research Abstracts
Title | Energy Research Abstracts PDF eBook |
Author | |
Publisher | |
Pages | 1740 |
Release | 1981 |
Genre | Power resources |
ISBN |
Savannah River Site Waste Management
Title | Savannah River Site Waste Management PDF eBook |
Author | |
Publisher | |
Pages | 766 |
Release | 1995 |
Genre | Environmental impact statements |
ISBN |
Preliminary Assessment of the Aquatic Impacts of a Proposed Defense Waste Processing Facility at the Savannah River Plant
Title | Preliminary Assessment of the Aquatic Impacts of a Proposed Defense Waste Processing Facility at the Savannah River Plant PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1979 |
Genre | |
ISBN |
A review of the literature indicates that a significant body of descriptive information exists concerning the aquatic ecology of Upper Three Runs Creek and Four Mile Creek of the Savannah River Plant south of Aiken, South Carolina. This information is adequate for preparation of an environmental document evaluating these streams. These streams will be impacted by construction and operation of a proposed Defense Waste Processing Facility for solidification of high level defense waste. Potential impacts include (1) construction runoff, erosion, and siltation, (2) effluents from a chemical and industrial waste treatment facility, and (3) radionuclide releases. In order to better evaluate potential impacts, recommend mitigation methods, and comply with NEPA requirements, additional quantitative biological information should be obtained through implementation of an aquatic baseline program.