Phase 2 Remedial Investigation Report, Peerless Photo Products Site (ID No. 1-52-031), Route 25A and Randall Road, Shoreham, New York
Title | Phase 2 Remedial Investigation Report, Peerless Photo Products Site (ID No. 1-52-031), Route 25A and Randall Road, Shoreham, New York PDF eBook |
Author | Peerless Photo Products |
Publisher | |
Pages | |
Release | 1998 |
Genre | Groundwater |
ISBN |
Phase 2 Remedial Investigation Report: Text (Sections 1.0 through 5.6
Title | Phase 2 Remedial Investigation Report: Text (Sections 1.0 through 5.6 PDF eBook |
Author | Dames & Moore |
Publisher | |
Pages | 0 |
Release | 1992 |
Genre | Ammunition |
ISBN |
This Phase 2 (PH2) Remedial Investigation (RI) report was prepared for selected study sites at the LAP Area of Joliet Army Ammunition Plant (JAAP), Joliet, Illinois. This report was prepared in accordance with the Federal Facilities Agreement (FAA) between the U.S. Army Environmental Center (USAEC; formerly USATHAMA), U.S. Environmental Protection Agency (EPA) Region V, and Illinois EPA. The report presents the results of the PH2 field investigation. The purpose of the report is to present the findings of sampling that was conducted to fill data gaps identified at the completion of the Phase 1 field activities. This report defines the nature and extent of contamination at thirteen study areas, Prairie Creek, Doyle Lake and Jordan Creek. All previous collected data from these areas is also summarized.
Phase 2 Remedial Investigation Report Army Materials Technology Laboratory Task Order 1 Remedial Investigation/Feasibility Study
Title | Phase 2 Remedial Investigation Report Army Materials Technology Laboratory Task Order 1 Remedial Investigation/Feasibility Study PDF eBook |
Author | |
Publisher | |
Pages | 280 |
Release | 1994 |
Genre | |
ISBN |
Phase 2 of a remedial investigation (RI) has been conducted at the U.S. Army Materials Technology Laboratory (MTL) in Watertown, Massachusetts. The U.S. Army Environmental Center, New England Division, contracted with Roy F. Weston, Inc. (WESTON) under the Base Closure Program Contract Number DAA15-9O-D-0009, Task Order 1, to complete, among other tasks, the Phase 2 RI at MTL. After the Phase 1 RI was initiated, MTL was recommended for closure by the Defense Secretary's Commission on Base Realignment and Closures. The original objectives of the Phase 1 RI did not include assessing concerns associated with future unlimited use of the site by the public after the closure of MTL. To do so, sampling in buildings, as well as more extensive environmental sampling and risk assessment, was required. This additional information was collected during the Phase 2 RI to properly evaluate potential remedial measures that would allow subsequent land use consistent with assigned reuse.
Final Report, Phase 2 Remedial Investigation, North First Street Site, San Jose, California
Title | Final Report, Phase 2 Remedial Investigation, North First Street Site, San Jose, California PDF eBook |
Author | Canonie Environmental (Firm) |
Publisher | |
Pages | |
Release | 1988 |
Genre | Groundwater |
ISBN |
Phase 2 Remedial Investigation Report
Title | Phase 2 Remedial Investigation Report PDF eBook |
Author | Woodward-Clyde Consultants |
Publisher | |
Pages | 25 |
Release | 1995 |
Genre | Anitec |
ISBN |
Phase 2 Remedial Investigation Report
Title | Phase 2 Remedial Investigation Report PDF eBook |
Author | Dames & Moore |
Publisher | |
Pages | |
Release | 1992 |
Genre | Ammunition |
ISBN |
This Phase 2 (PH2) Remedial Investigation (RI) report was prepared for selected study sites at the LAP Area of Joliet Army Ammunition Plant (JAAP), Joliet, Illinois. This report was prepared in accordance with the Federal Facilities Agreement (FAA) between the U.S. Army Environmental Center (USAEC; formerly USATHAMA), U.S. Environmental Protection Agency (EPA) Region V, and Illinois EPA. The report presents the results of the PH2 field investigation. The purpose of the report is to present the findings of sampling that was conducted to fill data gaps identified at the completion of the Phase 1 field activities. This report defines the nature and extent of contamination at thirteen study areas, Prairie Creek, Doyle Lake and Jordan Creek. All previous collected data from these areas is also summarized.
New York State Superfund Contract Phase II Remedial Investigation Report
Title | New York State Superfund Contract Phase II Remedial Investigation Report PDF eBook |
Author | Lawler, Matusky & Skelly Engineers |
Publisher | |
Pages | |
Release | 1997 |
Genre | Groundwater |
ISBN |