Overall Quality Assurance Project Plan, Remedial Investigation/Feasibility Study Fort Sheridan, Illinois, Volume 1
Title | Overall Quality Assurance Project Plan, Remedial Investigation/Feasibility Study Fort Sheridan, Illinois, Volume 1 PDF eBook |
Author | |
Publisher | |
Pages | 0 |
Release | 1995 |
Genre | |
ISBN |
This Overall Quality Assurance Project Plan (OQAPP) has been prepared as a component of Delivery Order No. 2 of Contract DAAA15-90-D-0017. The purpose of this OQAPP is to define responsibilities and authorities, and to prescribe requirements for assuring that the remedial investigation (RI) and feasibility study (FS) for Fort Sheridan are planned and executed in a manner consistent with U.S. Army Environmental Center (USAEC), U.S. Environmental Protection Agency (EPA) Region V, and Illinois Environmental Protection Agency (IEPA) quality assurance (QA) objectives. This OQAPP provides guidance and specifications to ensure that: (1) Field determinations and laboratory analytical results are of known quality and are valid, consistent, and compatible with the USAEC chemical database through the use of approved methods, preventive maintenance procedures, calibration and analytical protocols, quality control (QC) measurements, reviews, and audits. (2) Samples are obtained using appropriate, documented procedures; identified uniquely; and controlled through sample tracking systems and chain-of-custody procedures. (3) Records are retained as documentary evidence of the quality of samples, applied processes, equipment, and results.(4) Generated data are validated. (5) Calculations and evaluations are accurate, appropriate, and consistent throughout the project.
Overall Quality Assurance Project Plan, Remedial Investigation/Feasibility Study, Fort Sheridan, Illinois
Title | Overall Quality Assurance Project Plan, Remedial Investigation/Feasibility Study, Fort Sheridan, Illinois PDF eBook |
Author | Environmental science and engineering inc gainesville fl |
Publisher | |
Pages | 908 |
Release | 1995 |
Genre | |
ISBN |
This ESE standard operating procedure follows EPA SW-846 protocols with additional quality control requirements applicable for the Class lM analysis under the USAEC guidelines for implementation of ER 1110-1-263 of the following (see Table 1.1.1) semivolatile organic compounds in extracts prepared from all types of solid waste matrices, and soils.
Quality Assurance Project Plan Remedial Investigation/Feasibility Study (RI/FS) Sampling Activities
Title | Quality Assurance Project Plan Remedial Investigation/Feasibility Study (RI/FS) Sampling Activities PDF eBook |
Author | |
Publisher | |
Pages | 0 |
Release | 2009 |
Genre | Atwood Park (New Milford, Ill.) |
ISBN |
Formerly Utilized Sites Remedial Action Prpgram (FUSRAP)
Title | Formerly Utilized Sites Remedial Action Prpgram (FUSRAP) PDF eBook |
Author | United States. Department of Energy |
Publisher | |
Pages | 50 |
Release | 1990 |
Genre | Radioactive waste disposal |
ISBN |
Final Remedial Investigation/feasibility Study Quality Assurance Project Plan, Addendum for Source Area Operable Units, Aerojet Superfund Site
Title | Final Remedial Investigation/feasibility Study Quality Assurance Project Plan, Addendum for Source Area Operable Units, Aerojet Superfund Site PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 2006 |
Genre | Groundwater |
ISBN |
Quality Assurance Project Plan (QAPP) for Remedial Investigation/feasibility Study Work Plan
Title | Quality Assurance Project Plan (QAPP) for Remedial Investigation/feasibility Study Work Plan PDF eBook |
Author | Benchmark Environmental Engineering & Science |
Publisher | |
Pages | |
Release | 2006 |
Genre | Brownfields |
ISBN |
Weldadigheid van een' gemeen' en toch waarlijk niet gemeenen man
Title | Weldadigheid van een' gemeen' en toch waarlijk niet gemeenen man PDF eBook |
Author | |
Publisher | |
Pages | 16 |
Release | 2010 |
Genre | |
ISBN |