Oak Ridge Research Reactor Quarterly Report, April, May, and June 1984
Title | Oak Ridge Research Reactor Quarterly Report, April, May, and June 1984 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1985 |
Genre | |
ISBN |
The ORR operated at an average power level of 29.9 MW for 83.3% of the time during this period. The reactor was shut down on five occasions, one of which was unscheduled. Reactor downtime needed for refueling and checks was normal. The reactor remained available for operation 93.4% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature. Special tests completed during the quarter included results of flux measurements in the HFED experiment, cycles 167-D and 168-A, and results of reactivity worth measurements of MFE-4A Hf core sleeve as installed in core position E-3. In-service inspection completed during the quarter included the internal and external inspection of the pool heat exchanger.
Energy Research Abstracts
Title | Energy Research Abstracts PDF eBook |
Author | |
Publisher | |
Pages | 872 |
Release | 1988 |
Genre | Power resources |
ISBN |
Oak Ridge Research Reactor Quarterly Report, April, May, and June 1981
Title | Oak Ridge Research Reactor Quarterly Report, April, May, and June 1981 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1982 |
Genre | |
ISBN |
The ORR operated at an average power level of 29.8 MW for 90.7% of the time during April, May, and June 1981. The reactor was shut down on eight occasions, one of which was unscheduled. Reactor downtime needed for refueling, maintenance, and checks was normal, with the reactor remaining available for operation 91.6% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature. In-service inspection completed during the quarter is described.
Energy Research Abstracts
Title | Energy Research Abstracts PDF eBook |
Author | |
Publisher | |
Pages | 546 |
Release | 1985-06 |
Genre | Power resources |
ISBN |
Oak Ridge Research Reactor Quarterly Report, October, November, and December of 1969
Title | Oak Ridge Research Reactor Quarterly Report, October, November, and December of 1969 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1970 |
Genre | |
ISBN |
OAK RIDGE RESEARCH REACTOR QUARTERLY REPORT, OCTOBER, NOVEMBER, AND DECEMBER OF 1966
Title | OAK RIDGE RESEARCH REACTOR QUARTERLY REPORT, OCTOBER, NOVEMBER, AND DECEMBER OF 1966 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1967 |
Genre | |
ISBN |
Oak Ridge Research Reactor. Quarterly Report, April-June 1979
Title | Oak Ridge Research Reactor. Quarterly Report, April-June 1979 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1979 |
Genre | |
ISBN |
The ORR operated at an average power level of 29.9 MW for 77.9% of the time during April, May, and June of 1979. The reactor was shut down on seven occasions, two of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for operation 86.5% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature.