National Program for Inspection of Non-Federal Dams. Shenipsit Dam (CT 00482), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Shenipsit Dam (CT 00482), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report
Title National Program for Inspection of Non-Federal Dams. Shenipsit Dam (CT 00482), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report PDF eBook
Author CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher
Pages 88
Release 1980
Genre
ISBN

Download National Program for Inspection of Non-Federal Dams. Shenipsit Dam (CT 00482), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report Book in PDF, Epub and Kindle

The dam, completed in 1961, is an earth embankment approximately 390 feet in length with an emergency spillway at its left with end. It is a flood control project approximately 28.5 feet in height and capable of impounding approximately 520 acre-feet of water. The principal spillway is a drop inlet type structure consisting of a reinforced concrete riser with a 24 inch diameter reinforced concrete outlet pipe through the dam. The grass-bottomed emergency spillway channel is cut into natural ground at the left end of the dam and has a crest length of 125 feet. The top and slopes of the dam are grass covered, with a filter drain at the toe of the downstream slope. Based upon the visual inspection and past performance, the dam is judged to be in good condition. No evidence of instability was observed in the project. There are some remedial measures, such as filling of large holes in the 'waste areas' adjacent to the dam, reestablishment of greasy vegetation in the vehicle tracks on the top of the dam, and institution of a biennial inspection program, which require attention. The spillway capacity with the pond level to the top of the dam is 4700 cfs, which is equivalent to 1300% of the routed test flood outflow.

Government Reports Announcements & Index

Government Reports Announcements & Index
Title Government Reports Announcements & Index PDF eBook
Author
Publisher
Pages 492
Release 1984-11
Genre Science
ISBN

Download Government Reports Announcements & Index Book in PDF, Epub and Kindle

National Program for Inspection of Non-Federal Dams. Ellithorpe Dam (CT 00481), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Ellithorpe Dam (CT 00481), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report
Title National Program for Inspection of Non-Federal Dams. Ellithorpe Dam (CT 00481), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report PDF eBook
Author CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher
Pages 114
Release 1981
Genre
ISBN

Download National Program for Inspection of Non-Federal Dams. Ellithorpe Dam (CT 00481), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report Book in PDF, Epub and Kindle

Ellithorpe Dam consists of a 4,250 foot long earth embankment and a 200 foot wide grassed emergency spillway. The outlet consists of a concrete riser with 23 foot long weirs and a 48-inch reinforced concrete outlet pipe discharging to Middle River at the toe of dam. Based on the visual inspection, Ellithorpe Dam appears to be in good condition. There are several recreational vehicles paths on the slopes with some erosion taking place. Also, there are numerous rodent burrows on the upstream slope. Maintenance practices at Ellithorpe Dam appear to be good. Based on Corps of Engineers guidelines, the PMF was calculated to be 16,900 cfs inflow, with the outflow 10,800 cfs at an elevation of 591.6, which is 0.6 feet over the top of dam. This flow was used as the test flood.

National Program for Inspection of Non-Federal Dams. Riverside Pond Dam (CT 00336), Thames River Basin, Stafford, Connecticut. Phase I Inspection Program

National Program for Inspection of Non-Federal Dams. Riverside Pond Dam (CT 00336), Thames River Basin, Stafford, Connecticut. Phase I Inspection Program
Title National Program for Inspection of Non-Federal Dams. Riverside Pond Dam (CT 00336), Thames River Basin, Stafford, Connecticut. Phase I Inspection Program PDF eBook
Author CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher
Pages 76
Release 1980
Genre
ISBN

Download National Program for Inspection of Non-Federal Dams. Riverside Pond Dam (CT 00336), Thames River Basin, Stafford, Connecticut. Phase I Inspection Program Book in PDF, Epub and Kindle

The dam at Riverside Pond is a stone-faced earth embankment dam and is used to supply process water to the adjacent factory located just downstream of the dam. the dam has a height of 21 feet and is approximately 180 feet in length (including the spillway). A single span two lane bridge spans the spillway crest. The spillway is a stone masonry/concrete cap, uncontrolled broad crested weir, 64 feet in length. There are two outlet works, one located to the right of the spillway and the other at the left of the spillway. the right outlet works is a gated underground sluiceway that supplies process water to the adjacent mill. Flows at this outlet pass through the mill and discharge through the side wall of the building foundation and return to Furnace Brook. The left outlet works is also gated and is a 42 inch diameter riveted steel plate pipe through the left dam embankment. Based on the visual inspection at the site, the dam is considered to be in POOR condition. Deficiencies observed include: cracks and voids in the upstream masonry face vegetation growing in the upstream and downstream masonry walls, cracks and bulging of the downstream face of the dam, leakage through the left intake gates and deterioration of the outlet pipe, and seepage along the downstream face. Assuming the pool elevation at the top of the dam, the spillway can pass a flow of 4,435 CFS, which represents only 69 percent of the test flood outflow.

Government Reports Annual Index

Government Reports Annual Index
Title Government Reports Annual Index PDF eBook
Author
Publisher
Pages 1304
Release 1984
Genre Government reports announcements & index
ISBN

Download Government Reports Annual Index Book in PDF, Epub and Kindle

National Program for Inspection of Non-Federal Dams. Whitney Dam (CT 00477), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Whitney Dam (CT 00477), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report
Title National Program for Inspection of Non-Federal Dams. Whitney Dam (CT 00477), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report PDF eBook
Author CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher
Pages 96
Release 1980
Genre
ISBN

Download National Program for Inspection of Non-Federal Dams. Whitney Dam (CT 00477), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report Book in PDF, Epub and Kindle

Whitney Dam consists of a 1,400 foot long earth embankment and a 120 foot wide grassed emergency spillway. The outlet consists of a concrete riser with 7.5 foot long weirs on each side and a 30-inch reinforced concrete outlet pipe discharging into Patten Brook at the toe of dam. Maximum height of dam is 52 feet with a maximum storage capacity of 1,960 acre-feet. Based on the visual inspection, Whitney dam appears to be in good condition. Only one small cedar tree is growing on the embankment and there is evidence of recreational vehicles climbing the embankment in three locations. The rodent screen on one foundation drain outlet is partially missing and the slide gate stem at the principal spillway outlet is bent and appears to be inoperative. Calculations by the Soil Conservation Service show a peak inflow of 6,500 cfs. and a peak outflow of 1,930 cfs. with a maximum water surface elevation 2.0 feet below the crest of dam, which was used as the test flood.

National Program for Inspection of Non-Federal Dams. Lake Mark Dam (CT 00337), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Lake Mark Dam (CT 00337), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report
Title National Program for Inspection of Non-Federal Dams. Lake Mark Dam (CT 00337), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report PDF eBook
Author CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher
Pages 102
Release 1980
Genre
ISBN

Download National Program for Inspection of Non-Federal Dams. Lake Mark Dam (CT 00337), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report Book in PDF, Epub and Kindle

The dam, substantially completed in 1957 and certificate of approval dated April 27, 1972, consists of an earth embankment with a concrete corewall and a concrete spillway. The embankment is 580 feet long, has a maximum storage capacity of 185 acre-feet, and is 22 feet in height above the streambed of Diamond Ledge Brook at the toe of the dam. The top of the dam (elevation 21.0) is 20 feet wide and 6 feet above the spillway crest. The upstream slope and top of the dam have a sod cover except at the left end where there is a sandy beach area. The spillway consists of a 10 foot long and 3 foot wide broad-crested concrete weir and a rectangular chute (fish ladder) which extends 65 feet to the toe of the dam. The low-level outlet facility is an 8 inch corrugated metal pipe which is encased in concrete and located to the left of the spillway and gated at the downstream slope. Based upon the visual inspection at the site and past performance of the dam, the project is judged to be in fair condition. There are items requiring maintenance and monitoring such as seepage along the toe of the dam, cracking along the joints of the spillway chute, and the lack of proper slope protection. Also, the fill being dumped along the downstream slope should be graded to a lesser slope and slope protection placed. The spillway capacity with the lake level to the top of the dam is 440 cfs, which is 81% of the routed test flood outflow.