National Program for Inspection of Non-Federal Dams. Cheshire Reservoir Dam (CT 00303), Quinnipiac River Basin, Prospect, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Cheshire Reservoir Dam (CT 00303), Quinnipiac River Basin, Prospect, Connecticut. Phase I Inspection Report
Title National Program for Inspection of Non-Federal Dams. Cheshire Reservoir Dam (CT 00303), Quinnipiac River Basin, Prospect, Connecticut. Phase I Inspection Report PDF eBook
Author CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher
Pages 78
Release 1980
Genre
ISBN

Download National Program for Inspection of Non-Federal Dams. Cheshire Reservoir Dam (CT 00303), Quinnipiac River Basin, Prospect, Connecticut. Phase I Inspection Report Book in PDF, Epub and Kindle

Cheshire Reservoir Dam is an embankment dam 168 feet long having a maximum height of 18 feet, with a centrally located concrete and stone fill spillway section. The spillway is semi-circular in plan and 74 feet long. The overflow cascades over a series of 16-inch-high steps that discharge to Mixville Brook. The spillway is flanked at each end by concrete training walls. An earth embankment section is on each side of the spillway connecting to high ground at either side. The embankment side slopes are 1 vertical on 2 horizontal. The embankments are grass covered gravel and clay. A 24-in diameter blow-off pipe passes through the dam embankment and outlets at the right spillway training wall. Based on the visual inspection, the Cheshire Reservoir Dam appears to be in fair condition. The grassed slopes are well maintained. The vertical and horizontal alignment of the dam is good. Some erosion and slumping was noted adjacent to both training walls of the centrally located spillway. Several animal holes were noted on both downstream slopes (right and left of spillway). No upstream slope protection was noted along the right side of dam. A wet and spongy area was observed near the downstream toe along the left side of the dam. No piping or boils were noted. The concrete spillway is in poor condition. The surface has areas of extensive spalling, efflorescence, and erosion. The training walls have deteriorated and aggregate is visible. The gatehouse is in good condition. The test flood would overtop the dam by about 1.1 feet. The spillway is adequate to pass about 47 percent of the spillway test flood outflow without overtopping the dam.

National Program for Inspection of Non-Federal Dams. Plainville Reservoir Dam (CT 00259), Quinnipiac River Basin, Southington, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Plainville Reservoir Dam (CT 00259), Quinnipiac River Basin, Southington, Connecticut. Phase I Inspection Report
Title National Program for Inspection of Non-Federal Dams. Plainville Reservoir Dam (CT 00259), Quinnipiac River Basin, Southington, Connecticut. Phase I Inspection Report PDF eBook
Author CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher
Pages 80
Release 1980
Genre
ISBN

Download National Program for Inspection of Non-Federal Dams. Plainville Reservoir Dam (CT 00259), Quinnipiac River Basin, Southington, Connecticut. Phase I Inspection Report Book in PDF, Epub and Kindle

Plainville Reservoir Dam is an earthen embankment dam with a maximum height o 17 feet and a length of 688 feet. A concrete spillway section, 15 feet wide, is located near the left abutment. The upstream face has a slope of 1.5:1, and is protected by riprap. The downstream face has a slope of 1.5:1. There are two 6-inch diameter blowoffs located adjacent to the two gatehouse structures located downstream of the dam. Plainville Reservoir has a storage volume of 528 acre-feet; the size classification is thus small. In general, the dam was judged to be in fair condition. The vertical and horizontal alignment is good; however, a slight dip in the crest was noted in the vicinity of the downstream gatehouse. Several windows were observed in the upstream riprap, which ends about 2 feet below the crest of the dam. Some small seeps were observed near the downstream slope (right side of the dam). The concrete spillway and training walls were in good condition. Some flow of water was observed passing below the spillway and flowing out the spillway channel. The spillway is not adequate to pass the 0.5 PMF test flood outflow without overtopping the dam. The test flood would overtop the dam by about 0.2 feet. The spillway pass about 46 percent of the test flood outflow without overtopping the dam.

National Program for Inspection of Non-Federal Dams. Mixville Pond Dam (CT 00302), Quinnipiac River Basin, Cheshire, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Mixville Pond Dam (CT 00302), Quinnipiac River Basin, Cheshire, Connecticut. Phase I Inspection Report
Title National Program for Inspection of Non-Federal Dams. Mixville Pond Dam (CT 00302), Quinnipiac River Basin, Cheshire, Connecticut. Phase I Inspection Report PDF eBook
Author CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher
Pages 65
Release 1981
Genre
ISBN

Download National Program for Inspection of Non-Federal Dams. Mixville Pond Dam (CT 00302), Quinnipiac River Basin, Cheshire, Connecticut. Phase I Inspection Report Book in PDF, Epub and Kindle

Mixville Pond Dam is an earth embankment with a vertical stone masonry downstream face that is approximately 290 feet long and 16.5 feet high. The spillway is 2 feet lower than the crest and is located near the center of the dam. At the west end of the spillway, there is a simple masonry gate inlet structure. The gate controls a 30-inch cast iron low-level discharge pipe that passes through the base of the dam. The assessment of the dam is based on a visual inspection, available information and hydraulic/hydrologic computation. The dam is judged to be in fair condition with several areas that require attention. These areas include seepage through the dam, below and adjacent to the spillway, bulging stone in the downstream masonry face and thick brush covering the crest of the dam to the east of the spillway. The spillway capacity at the top of the dam is 375 cfs or 14 percent of the test flood outflow. The test flood outflow will overtop the dam by 1.9 feet.

Government Reports Annual Index

Government Reports Annual Index
Title Government Reports Annual Index PDF eBook
Author
Publisher
Pages 1316
Release 1984
Genre Government reports announcements & index
ISBN

Download Government Reports Annual Index Book in PDF, Epub and Kindle

National Program for Inspection of Non-Federal Dams. Lake Wintergreen Dam (CT 00118), Quinnipiac River Basin, Hamden, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Lake Wintergreen Dam (CT 00118), Quinnipiac River Basin, Hamden, Connecticut. Phase I Inspection Report
Title National Program for Inspection of Non-Federal Dams. Lake Wintergreen Dam (CT 00118), Quinnipiac River Basin, Hamden, Connecticut. Phase I Inspection Report PDF eBook
Author CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher
Pages 77
Release 1978
Genre
ISBN

Download National Program for Inspection of Non-Federal Dams. Lake Wintergreen Dam (CT 00118), Quinnipiac River Basin, Hamden, Connecticut. Phase I Inspection Report Book in PDF, Epub and Kindle

The dam consists of two sections. The portion of the dam from the spillway 185 feet to the left is an earthen embankment on the upstream side of a rubble masonry retaining wall. The remaining portion of the dam to the left of the retaining wall is an earthen embankment. According to the existing information, a rubble masonry corewall exists from the spillway 260 feet to the left. The spillway is reported as a 50-foot-wide concrete weir flowing to a steep channel cut into natural rock formations. A 16 inch diameter high level intake approximately 900 + or - feet to the right of the dam was used as a supply main. The supply main is operable, however the reservoir is not used as a water supply due to the turbidity and poor color quality of the water. A 12 inch, low level inlet passes through the dam, but is presently inoperable. Based upon visual inspections at the site and past performance history, the dam is judged to be inf air condition. No evidence of structural instability in the retaining wall or the embankment portions of the dam was observed. However, the masonry retaining wall is very irregular making it impossible to detect any misalignment or movement of the wall. There are areas requiring attention. Based upon our hydraulic computations, the spillway capacity is 850 cubic feet per second, which is equivalent to approximately 28 percent of the Test Flood. Peak inflow to the reservoir is 3,500 cubic feet per second; peak outflow (Test Flood) is 3,000 cubic feet per second with the dam overtopped 0.8 feet.

National Program for Inspection of Non-Federal Dams. Bradley Hubbard Reservoir Dam (CT 00132), Quinnipiac River Basin, Meriden, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Bradley Hubbard Reservoir Dam (CT 00132), Quinnipiac River Basin, Meriden, Connecticut. Phase I Inspection Report
Title National Program for Inspection of Non-Federal Dams. Bradley Hubbard Reservoir Dam (CT 00132), Quinnipiac River Basin, Meriden, Connecticut. Phase I Inspection Report PDF eBook
Author CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher
Pages 103
Release 1980
Genre
ISBN

Download National Program for Inspection of Non-Federal Dams. Bradley Hubbard Reservoir Dam (CT 00132), Quinnipiac River Basin, Meriden, Connecticut. Phase I Inspection Report Book in PDF, Epub and Kindle

The project, built about 1891 has a total length of 545 feet consisting of a 340-foot masonry core with earth fill on the upstream and downstream sides, a 115 foot long earth embankment at the right end of the dam, and sections of concrete corewall at each end. A 71-foot broad-crested masonry spillway is located at the central portion of the dam. The top of the dam (elevation 312.0) is 7 feet wide and 16.5 feet above the Harbor Brook streambed. The maximum storage capacity with the pond level to the top of the dam is approximately 216 acre-feet of water. A gatehouse, located upstream and adjacent to the right end of the spillway, contains two valves which regulate a 20-inch blowoff and a 12-inch supply main which once led to the Bradley and Hubbard Corp. In accordance with the Army Corps of Engineers's Guidelines, Bradley Hubbard Reservoir Dam is classified as a high hazard, small size dam. The test flood range is from one-half to full Probable Maximum Flood (PMF). The selected test flood for Bradley Hubbard Reservoir Dam is equivalent to the PMF. Peak inflow to the reservoir at the test flood is 1500 cubic feet per second (cfs); peak outflow is 1325 cfs with the dam overtopped by 0.9 feet. The spillway capacity with the reservoir level to the top of the dam is 223 cfs, which is equivalent to 17% of the routed test flood outflow.

National Program for Inspection of Non-Federal Dams. Black Pond Dam (CT 00135), Quinnipiac River Basin, Meriden, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Black Pond Dam (CT 00135), Quinnipiac River Basin, Meriden, Connecticut. Phase I Inspection Report
Title National Program for Inspection of Non-Federal Dams. Black Pond Dam (CT 00135), Quinnipiac River Basin, Meriden, Connecticut. Phase I Inspection Report PDF eBook
Author CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher
Pages 68
Release 1981
Genre
ISBN

Download National Program for Inspection of Non-Federal Dams. Black Pond Dam (CT 00135), Quinnipiac River Basin, Meriden, Connecticut. Phase I Inspection Report Book in PDF, Epub and Kindle

Black Pond Dam is a stone masonry and earth embankment structure approximately 100 feet long and 26 feet high with a 25-foot wide paved road (Birdsey Avenue) on the crest. A majority of the downstream embankment consists of a vertical stone masonry face. The 14-foot wide spillway is a 14-foot by 3-foot concrete culvert under the road at approximately the center of the dam. There is a mortared stone gate inlet structure that controls a 20-inch cast iron water main that passes through the base of the dam. The water main connects into the City's distribution network, and is used only for emergencies. There is no low-level discharge. The pond is presently used for recreation. The drainage area is 1.2 square miles and the reservoir has approximately 353 acre-feet of storage capacity. The assessment of the dam is based on the visual inspection, past operational performance and hydraulic/hydrologic computations. The dam is judged to be in fair condition with several areas that require attention. These areas include seepage through the dam, missing mortar in the downstream face, trees on the embankments as well as along the toe of the dam and the lack of a low-level discharge pipe. The test flood for this dam is 1/2 the PMF and is calculated to be 560 cfs. The spillway capacity at the top of the dam is 250 or 45 percent of the test flood outflow. The test flood outflow will overtop the dam by 1.1 feet.