National Dam Inspection Program. Acre Pond Dam (NDI ID Number PA-00973, DER ID Number 58-34), Susquehanna River Basin, Partners Creek, Susquehanna County, Pennsylvania. Phase I Inspection Report
Title | National Dam Inspection Program. Acre Pond Dam (NDI ID Number PA-00973, DER ID Number 58-34), Susquehanna River Basin, Partners Creek, Susquehanna County, Pennsylvania. Phase I Inspection Report PDF eBook |
Author | |
Publisher | |
Pages | 59 |
Release | 1981 |
Genre | |
ISBN |
Based on visual inspection, Acre Pond Dam is judged to be in fair structural condition. In the absence of an adequate spillway, the dam is subject to frequent overtopping. Based on the location of the downstream dwellings and the fact that a few lives could be lost should the dam fail, the dam is classified as a significant hazard dam. Since the spillway cannot pass the 100- year flood without overtopping the dam, the spillway is rated as inadequate. Although there is some seepage thru the dam, there is no evidence of structural instability. There is no formal inspection and maintenance program or warning system and evacuation plan in effect at Acre Pond Dam. The dam is not properly maintained.
Government Reports Announcements & Index
Title | Government Reports Announcements & Index PDF eBook |
Author | |
Publisher | |
Pages | 800 |
Release | 1982 |
Genre | Science |
ISBN |
Government Reports Annual Index
Title | Government Reports Annual Index PDF eBook |
Author | |
Publisher | |
Pages | 92 |
Release | 1982 |
Genre | Research |
ISBN |
Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.
Government Reports Annual Index: Keyword A-L
Title | Government Reports Annual Index: Keyword A-L PDF eBook |
Author | |
Publisher | |
Pages | 1016 |
Release | 1982 |
Genre | Government reports announcements & index |
ISBN |
National Dam Inspection Program. Hathaway Pond Dam (NDI ID Number PA 00050, PennDER Number 58-06), Susquehanna River Basin, West Branch of Lackawanna River, Susquehanna County, Pennsylvania. Phase I Inspection Report
Title | National Dam Inspection Program. Hathaway Pond Dam (NDI ID Number PA 00050, PennDER Number 58-06), Susquehanna River Basin, West Branch of Lackawanna River, Susquehanna County, Pennsylvania. Phase I Inspection Report PDF eBook |
Author | John A. Dziubek |
Publisher | |
Pages | 72 |
Release | 1981 |
Genre | |
ISBN |
Hathaway Pond Dam is located in Ararat Township, Susquehanna County, Pennsylvania. The reservoir was originally created to provide water for power purposes. The reservoir slopes are moderate with a good cover of vegetation. There are three ponds upstream from Hathaway Pond Dam on two tributary streams. The western stream contains Romobe Lake (PennDER I.D. No. 58-10) which is 1750 feet upstream from Hathaway Pond Dam. The eastern tributary contains Ball Lake and an unnamed smaller pond in series. Ball Lake is 2450 feet upstream and will retain considerable storage while the smaller unnamed pond was considered to have no effect on Hathaway Pond Dam. Two homes, a trailer, and township road are located 1800 feet downstream from Hathaway Pond Dam. These could suffer economic damage in the event of a dam failure.
National Dam Inspection Program. Saxe Pond Dam (NDI I.D. Number PA-729, DER ID Number 8-10) Susquehanna River Basin. North Branch Mehoopany Creek, Bradford County, Pennsylvania. Phase I Inspection Report
Title | National Dam Inspection Program. Saxe Pond Dam (NDI I.D. Number PA-729, DER ID Number 8-10) Susquehanna River Basin. North Branch Mehoopany Creek, Bradford County, Pennsylvania. Phase I Inspection Report PDF eBook |
Author | R. Jeffrey Kimball |
Publisher | |
Pages | 65 |
Release | 1981 |
Genre | |
ISBN |
The dam is located approximately 2 miles northwest of the Village of Colley, Wilmot Township, Bradford County, Pennsylvania. The inspection consisted of: Visual inspection of the retaining structure, abutments and toe; Examination of the spillway facilities, exposed portion of any outlet works and other appurtenant works; Observations affecting the runoff potential of the drainage basin; and Evaluation of the downstream area hazard potential. The dam appears to be in good condition and adequately maintained. From a brief survey conducted during the inspection, it was noted that the low spot on the crest of the dam exits at the top left edge of the spillway crest. It was observed during the inspection that a new concrete cap had been placed on the structure. The concrete appeared to be in good condition. The dam was constructed with dry rubble masonry with an upstream earthfill. No concrete exists on the downstream face of the structure or on the bench located along the downstream face of the structure. The rubble masonry appeared to be in good condition and well maintained.
National Dam Inspection Program. PA-467 Dam (NDI I.D. Number PA-00054, DER I.D. Number 58-131, SCS I.D. Number PA-467) Susquehanna County Commissioners, Susquehanna River Basin, Tributary to Martins Creek. Susquehanna County, Pennsylvania. Phase I Inspection Report
Title | National Dam Inspection Program. PA-467 Dam (NDI I.D. Number PA-00054, DER I.D. Number 58-131, SCS I.D. Number PA-467) Susquehanna County Commissioners, Susquehanna River Basin, Tributary to Martins Creek. Susquehanna County, Pennsylvania. Phase I Inspection Report PDF eBook |
Author | Frederick Futchko |
Publisher | |
Pages | 86 |
Release | 1979 |
Genre | |
ISBN |
The dam consists of a zoned, earthfill embankment that is 590 feet long and 52 feet high at its maximum section. The main spillway is a drop spillway located near the right abutment of the dam. It consists of a concrete riser connected to a 30-inch diameter reinforced concrete pipe under the embankment. The auxiliary spillway is an excavated channel along the left abutment of the dam. It is a grass-linked excavation in earth. Based on visual inspection, available records, calculations and past operational performance, PA-467 Dam is judged to be in good condition. The existing spillway can pass the Probable Maximum Flood(PMF) without overtopping of the dam. The spillway capacity is rated as adequate. There is a slope stability analysis for the embankment, and it indicates that the embankment has adequate factors of safety. There is no evidence of significant problems threatening the embankment.