Modification of Interchange and Transmission Loading Relief Reliability Standards - And Electric Reliability Organization Interpretation (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)

Modification of Interchange and Transmission Loading Relief Reliability Standards - And Electric Reliability Organization Interpretation (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)
Title Modification of Interchange and Transmission Loading Relief Reliability Standards - And Electric Reliability Organization Interpretation (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) PDF eBook
Author The Law The Law Library
Publisher Createspace Independent Publishing Platform
Pages 30
Release 2018-10-14
Genre
ISBN 9781727865929

Download Modification of Interchange and Transmission Loading Relief Reliability Standards - And Electric Reliability Organization Interpretation (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) Book in PDF, Epub and Kindle

Modification of Interchange and Transmission Loading Relief Reliability Standards - and Electric Reliability Organization Interpretation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) The Law Library presents the complete text of the Modification of Interchange and Transmission Loading Relief Reliability Standards - and Electric Reliability Organization Interpretation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition). Updated as of May 29, 2018 Pursuant to section 215 of the Federal Power Act, the Federal Energy Regulatory Commission (Commission) approves five of six modified Reliability Standards submitted to the Commission for approval by the North American Electric Reliability Corporation (NERC). The Commission directs NERC to submit a filing that provides an explanation regarding one aspect of the sixth modified Reliability Standard submitted by NERC. The Commission also approves NERC's proposed interpretations of five specific requirements of Commission-approved Reliability Standards. This book contains: - The complete text of the Modification of Interchange and Transmission Loading Relief Reliability Standards - and Electric Reliability Organization Interpretation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) - A table of contents with the page number of each section

Modification of Interchange and Transmission Loading Relief Reliability Standards, Etc. (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)

Modification of Interchange and Transmission Loading Relief Reliability Standards, Etc. (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)
Title Modification of Interchange and Transmission Loading Relief Reliability Standards, Etc. (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) PDF eBook
Author The Law The Law Library
Publisher Createspace Independent Publishing Platform
Pages 26
Release 2018-10-14
Genre
ISBN 9781727865943

Download Modification of Interchange and Transmission Loading Relief Reliability Standards, Etc. (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) Book in PDF, Epub and Kindle

Modification of Interchange and Transmission Loading Relief Reliability Standards, etc. (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) The Law Library presents the complete text of the Modification of Interchange and Transmission Loading Relief Reliability Standards, etc. (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition). Updated as of May 29, 2018 Pursuant to section 215 of the Federal Power Act (FPA), the Federal Energy Regulatory Commission (Commission) approves Reliability Standard IRO-006-4, submitted to the Commission for approval by the North American Electric Reliability Corporation (NERC). The Reliability Standard addresses transmission loading relief requirements, which provide a mechanism to manage and, if necessary, curtail interchange transactions. In addition, pursuant to section 215(d)(5) of the FPA, the Commission directs NERC to develop modifications to Reliability Standard IRO-006-4 to address specific Commission concerns. This book contains: - The complete text of the Modification of Interchange and Transmission Loading Relief Reliability Standards, etc. (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) - A table of contents with the page number of each section

Transmission Operations Reliability Standards and Interconnection Reliability Operations and Coordination Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)

Transmission Operations Reliability Standards and Interconnection Reliability Operations and Coordination Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)
Title Transmission Operations Reliability Standards and Interconnection Reliability Operations and Coordination Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) PDF eBook
Author The Law The Law Library
Publisher Createspace Independent Publishing Platform
Pages 32
Release 2018-10-16
Genre
ISBN 9781727887686

Download Transmission Operations Reliability Standards and Interconnection Reliability Operations and Coordination Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) Book in PDF, Epub and Kindle

Transmission Operations Reliability Standards and Interconnection Reliability Operations and Coordination Reliability Standards (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) The Law Library presents the complete text of the Transmission Operations Reliability Standards and Interconnection Reliability Operations and Coordination Reliability Standards (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition). Updated as of May 29, 2018 The Commission approves revisions to the Transmission Operations and Interconnection Reliability Operations and Coordination Reliability Standards, developed by the North American Electric Reliability Corporation, which the Commission has certified as the Electric Reliability Organization responsible for developing and enforcing mandatory Reliability Standards. The Commission also directs NERC to make three modifications to the standards within 18 months of the effective date of the final rule. This book contains: - The complete text of the Transmission Operations Reliability Standards and Interconnection Reliability Operations and Coordination Reliability Standards (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) - A table of contents with the page number of each section

Transmission Planning Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)

Transmission Planning Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)
Title Transmission Planning Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) PDF eBook
Author The Law The Law Library
Publisher Createspace Independent Publishing Platform
Pages 36
Release 2018-10-16
Genre
ISBN 9781727887723

Download Transmission Planning Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) Book in PDF, Epub and Kindle

Transmission Planning Reliability Standards (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) The Law Library presents the complete text of the Transmission Planning Reliability Standards (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition). Updated as of May 29, 2018 Under section 215 of the Federal Power Act, the Federal Energy Regulatory Commission remands proposed Transmission Planning (TPL) Reliability Standard TPL-002-0b, submitted by the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization. The proposed Reliability Standard includes a provision that allows for planned load shed in a single contingency provided that the plan is documented and alternatives are considered and vetted in an open and transparent process. The Commission finds that this provision is vague, unenforceable and not responsive to the previous Commission directives on this matter. Accordingly, the Final Rule remands NERC's proposal as unjust, unreasonable, unduly discriminatory or preferential, and not in the public interest. This book contains: - The complete text of the Transmission Planning Reliability Standards (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) - A table of contents with the page number of each section

Balancing Authority Control, Inadvertent Interchange, and Facility Interconnection Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)

Balancing Authority Control, Inadvertent Interchange, and Facility Interconnection Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)
Title Balancing Authority Control, Inadvertent Interchange, and Facility Interconnection Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) PDF eBook
Author The Law The Law Library
Publisher Createspace Independent Publishing Platform
Pages 30
Release 2018-10-06
Genre
ISBN 9781727771343

Download Balancing Authority Control, Inadvertent Interchange, and Facility Interconnection Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) Book in PDF, Epub and Kindle

Balancing Authority Control, Inadvertent Interchange, and Facility Interconnection Reliability Standards (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) The Law Library presents the complete text of the Balancing Authority Control, Inadvertent Interchange, and Facility Interconnection Reliability Standards (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition). Updated as of May 29, 2018 The Federal Energy Regulatory Commission (Commission) approves Reliability Standards BAL-005-1 (Balancing Authority Control) and FAC-001-3 (Facility Interconnection Requirements), submitted by the North American Electric Reliability Corporation, as well as the retirement of Reliability Standards BAL-005-0.2b (Automatic Generation Control), FAC-001-2 (Facility Interconnection Requirements), and BAL-006-2 (Inadvertent Interchange). This book contains: - The complete text of the Balancing Authority Control, Inadvertent Interchange, and Facility Interconnection Reliability Standards (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) - A table of contents with the page number of each section

Electric Reliability Organization Interpretations of Specific Requirements of Frequency Response and Bias and Voltage (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)

Electric Reliability Organization Interpretations of Specific Requirements of Frequency Response and Bias and Voltage (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)
Title Electric Reliability Organization Interpretations of Specific Requirements of Frequency Response and Bias and Voltage (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) PDF eBook
Author The Law The Law Library
Publisher Createspace Independent Publishing Platform
Pages 34
Release 2018-10-07
Genre
ISBN 9781727780529

Download Electric Reliability Organization Interpretations of Specific Requirements of Frequency Response and Bias and Voltage (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) Book in PDF, Epub and Kindle

Electric Reliability Organization Interpretations of Specific Requirements of Frequency Response and Bias and Voltage (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) The Law Library presents the complete text of the Electric Reliability Organization Interpretations of Specific Requirements of Frequency Response and Bias and Voltage (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition). Updated as of May 29, 2018 Pursuant to section 215 of the Federal Power Act, the Federal Energy Regulatory Commission hereby approves the North American Electric Reliability Corporation's (NERC) interpretation of one Commission-approved Reliability Standard, BAL-003-0, Frequency Response and Bias; and remands NERC's proposed interpretation of VAR-001-1, Voltage and Reactive Control, for reconsideration consistent with this Final Rule. This book contains: - The complete text of the Electric Reliability Organization Interpretations of Specific Requirements of Frequency Response and Bias and Voltage (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) - A table of contents with the page number of each section

Retirement of Requirements in Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)

Retirement of Requirements in Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition)
Title Retirement of Requirements in Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) PDF eBook
Author The Law The Law Library
Publisher Createspace Independent Publishing Platform
Pages 28
Release 2018-10-15
Genre
ISBN 9781727877083

Download Retirement of Requirements in Reliability Standards (Us Federal Energy Regulatory Commission Regulation) (Ferc) (2018 Edition) Book in PDF, Epub and Kindle

Retirement of Requirements in Reliability Standards (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) The Law Library presents the complete text of the Retirement of Requirements in Reliability Standards (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition). Updated as of May 29, 2018 Pursuant to section 215 of the Federal Power Act, the Commission approves the retirement of 34 requirements within 19 Reliability Standards identified by the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization. The requirements approved for retirement either: Provide little protection for Bulk-Power System reliability; or are redundant with other aspects of the Reliability Standards. In addition, the Commission withdraws 41 Commission directives that NERC develop modifications to Reliability Standards. This rule is part of the Commission's ongoing effort to review its requirements and reduce unnecessary burdens by eliminating requirements that are not necessary to the performance of the Commission's regulatory responsibilities. This book contains: - The complete text of the Retirement of Requirements in Reliability Standards (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) - A table of contents with the page number of each section