Macro-corridor Study and Alternative Evaluation for the Proposed 230 KV Transmission Line from the Charlie Creek Substation to the Proposed Williston 230 KV Substation
Title | Macro-corridor Study and Alternative Evaluation for the Proposed 230 KV Transmission Line from the Charlie Creek Substation to the Proposed Williston 230 KV Substation PDF eBook |
Author | Basin Electric Power Cooperative |
Publisher | |
Pages | 264 |
Release | 1984 |
Genre | Electric lines |
ISBN |
Macro-corridor Study and Alternative Evaluation for the Proposed 345 KV Transmission Line from the Antelope Valley Station to the Charlie Creek Substation
Title | Macro-corridor Study and Alternative Evaluation for the Proposed 345 KV Transmission Line from the Antelope Valley Station to the Charlie Creek Substation PDF eBook |
Author | Basin Electric Power Cooperative |
Publisher | |
Pages | 188 |
Release | 1980 |
Genre | Electric lines |
ISBN |
Macro-corridor Study Report
Title | Macro-corridor Study Report PDF eBook |
Author | Mangi Environmental Group, Inc |
Publisher | |
Pages | 80 |
Release | 2005 |
Genre | Electric power distribution |
ISBN |
"One project under consideration by RUS is loan funding for the construction of an electric power transmission line by the Central Electric Power Cooperative Inc (CEPCI) from existing power sources to a new Berkely Electric substation near the town of McClellanville, SC. The need for additional reliable power and alrenative means to provide that power are discussed in a separate accompanying report - the Alternative Evaluation Study... This macro-corridor study was conducted to determine what potential transmission line routing options were available for the McClellanville line, and in general terms, how they might be planned to avoid potential environmental, social, cultural, and economic effects. The results and findings of this report will serve as the foundation upon which a more detailed NEPA analysis will be conducted. For this study, three originating points from the transmission line - Charity, Jamestown, and Winyah/Belle Isle, and a single destination point - a proposed substation in McClellanville, were considered." - pg. 1-2.
Colstrip Transmission Project, Draft Federal Corridor Option Summary (1978) B1; Federal Corridor Option Summary B2; Record of Decision
Title | Colstrip Transmission Project, Draft Federal Corridor Option Summary (1978) B1; Federal Corridor Option Summary B2; Record of Decision PDF eBook |
Author | |
Publisher | |
Pages | 50 |
Release | 1979 |
Genre | |
ISBN |
Overview and Directory
Title | Overview and Directory PDF eBook |
Author | |
Publisher | |
Pages | 672 |
Release | 1982 |
Genre | Children with disabilities |
ISBN |
Aggravations and Ameliorations
Title | Aggravations and Ameliorations PDF eBook |
Author | |
Publisher | B. Jain Publishers |
Pages | 328 |
Release | |
Genre | |
ISBN |
Fresh from the Farm 6pk
Title | Fresh from the Farm 6pk PDF eBook |
Author | Rigby |
Publisher | |
Pages | 0 |
Release | 2006 |
Genre | |
ISBN | 9781418914219 |