345 KV Transmission Line Construction, Flint Creek to Morgan, Macro-corridor Study

345 KV Transmission Line Construction, Flint Creek to Morgan, Macro-corridor Study
Title 345 KV Transmission Line Construction, Flint Creek to Morgan, Macro-corridor Study PDF eBook
Author
Publisher
Pages 272
Release 1984
Genre
ISBN

Download 345 KV Transmission Line Construction, Flint Creek to Morgan, Macro-corridor Study Book in PDF, Epub and Kindle

Macro Corridor Study

Macro Corridor Study
Title Macro Corridor Study PDF eBook
Author Four Corners Environmental Research Institute
Publisher
Pages
Release 1981
Genre Overhead electric lines
ISBN

Download Macro Corridor Study Book in PDF, Epub and Kindle

Comanche to Walsenburg 230-kV Transmission Line Project Macro Corridor Study

Comanche to Walsenburg 230-kV Transmission Line Project Macro Corridor Study
Title Comanche to Walsenburg 230-kV Transmission Line Project Macro Corridor Study PDF eBook
Author
Publisher
Pages 128
Release 1994
Genre
ISBN

Download Comanche to Walsenburg 230-kV Transmission Line Project Macro Corridor Study Book in PDF, Epub and Kindle

Macro-corridor Study

Macro-corridor Study
Title Macro-corridor Study PDF eBook
Author United States. Rural Utilities Service
Publisher
Pages 32
Release 2009
Genre Electric lines
ISBN

Download Macro-corridor Study Book in PDF, Epub and Kindle

Macro-corridor Study Report

Macro-corridor Study Report
Title Macro-corridor Study Report PDF eBook
Author Mangi Environmental Group, Inc
Publisher
Pages 80
Release 2005
Genre Electric power distribution
ISBN

Download Macro-corridor Study Report Book in PDF, Epub and Kindle

"One project under consideration by RUS is loan funding for the construction of an electric power transmission line by the Central Electric Power Cooperative Inc (CEPCI) from existing power sources to a new Berkely Electric substation near the town of McClellanville, SC. The need for additional reliable power and alrenative means to provide that power are discussed in a separate accompanying report - the Alternative Evaluation Study... This macro-corridor study was conducted to determine what potential transmission line routing options were available for the McClellanville line, and in general terms, how they might be planned to avoid potential environmental, social, cultural, and economic effects. The results and findings of this report will serve as the foundation upon which a more detailed NEPA analysis will be conducted. For this study, three originating points from the transmission line - Charity, Jamestown, and Winyah/Belle Isle, and a single destination point - a proposed substation in McClellanville, were considered." - pg. 1-2.

Comanche to Walsenburg 230-kV transmission line project macro corridor study

Comanche to Walsenburg 230-kV transmission line project macro corridor study
Title Comanche to Walsenburg 230-kV transmission line project macro corridor study PDF eBook
Author
Publisher
Pages 0
Release 1994
Genre
ISBN

Download Comanche to Walsenburg 230-kV transmission line project macro corridor study Book in PDF, Epub and Kindle

Macro-corridor Study and Alternative Evaluation for the Proposed 345 KV Transmission Line from the Antelope Valley Station to the Charlie Creek Substation

Macro-corridor Study and Alternative Evaluation for the Proposed 345 KV Transmission Line from the Antelope Valley Station to the Charlie Creek Substation
Title Macro-corridor Study and Alternative Evaluation for the Proposed 345 KV Transmission Line from the Antelope Valley Station to the Charlie Creek Substation PDF eBook
Author Basin Electric Power Cooperative
Publisher
Pages 188
Release 1980
Genre Electric lines
ISBN

Download Macro-corridor Study and Alternative Evaluation for the Proposed 345 KV Transmission Line from the Antelope Valley Station to the Charlie Creek Substation Book in PDF, Epub and Kindle