Litigation Technical Support and Services, Rocky Mountain Arsenal. Building 1727 Sump, Interim Response Action Assessment, Task 30, Draft Final Treatability Study

Litigation Technical Support and Services, Rocky Mountain Arsenal. Building 1727 Sump, Interim Response Action Assessment, Task 30, Draft Final Treatability Study
Title Litigation Technical Support and Services, Rocky Mountain Arsenal. Building 1727 Sump, Interim Response Action Assessment, Task 30, Draft Final Treatability Study PDF eBook
Author
Publisher
Pages 71
Release 1987
Genre
ISBN

Download Litigation Technical Support and Services, Rocky Mountain Arsenal. Building 1727 Sump, Interim Response Action Assessment, Task 30, Draft Final Treatability Study Book in PDF, Epub and Kindle

Based on the literature review, electrochemical precipitation and activated alumina adsorption were judged to be the most promising technologies for interim treatment of wastewater in Sump 1727. Sections of the report discuss the following: (1) Raw water characteristics; (2) proposed treatment levels for discharge to the RMA sanitary sewer; (3) treatability test methods that were used to evaluate the two technologies; (4) results of the tests; (5) selection of alumina as the preferred treatment; (6) conceptual design; and (7) costs. jg.

Rocky Mountain Arsenal Building 1727 Sump, Interim Response Action Assessment. Task 30, Draft Final Treatability Study

Rocky Mountain Arsenal Building 1727 Sump, Interim Response Action Assessment. Task 30, Draft Final Treatability Study
Title Rocky Mountain Arsenal Building 1727 Sump, Interim Response Action Assessment. Task 30, Draft Final Treatability Study PDF eBook
Author
Publisher
Pages 71
Release 1987
Genre
ISBN

Download Rocky Mountain Arsenal Building 1727 Sump, Interim Response Action Assessment. Task 30, Draft Final Treatability Study Book in PDF, Epub and Kindle

Based on the literature review, electrochemical precipitation and activated alumina adsorption were judged to be the most promising technologies for interim treatment of wastewater in SUMP 1727. Sections of the report discuss the following: (1) Raw water characteristics; (2) Proposed treatment levels for discharge to the RMA sanitary sewer; (3) Treatability test methods that were used to evaluate the two technologies; (4) Results of the tests; (5) Selection of alumina as the preferred treatment; (6) Conceptual design; (7); Costs.-BKA.

Litigation Technical Support and Services Rocky Mountain Arsenal. Biota Remedial Investigation, Version 3.2

Litigation Technical Support and Services Rocky Mountain Arsenal. Biota Remedial Investigation, Version 3.2
Title Litigation Technical Support and Services Rocky Mountain Arsenal. Biota Remedial Investigation, Version 3.2 PDF eBook
Author
Publisher
Pages 172
Release 1989
Genre
ISBN

Download Litigation Technical Support and Services Rocky Mountain Arsenal. Biota Remedial Investigation, Version 3.2 Book in PDF, Epub and Kindle

Litigation Technical Support and Services, Rocky Mountain Arsenal. Biota Remedial Investigation (Version 3.2)

Litigation Technical Support and Services, Rocky Mountain Arsenal. Biota Remedial Investigation (Version 3.2)
Title Litigation Technical Support and Services, Rocky Mountain Arsenal. Biota Remedial Investigation (Version 3.2) PDF eBook
Author ENVIRONMENTAL SCIENCE AND ENGINEERING INC ENGLEWOOD CO.
Publisher
Pages 373
Release 1989
Genre
ISBN

Download Litigation Technical Support and Services, Rocky Mountain Arsenal. Biota Remedial Investigation (Version 3.2) Book in PDF, Epub and Kindle

Final Decision Document for the Interim Response Action for Building 1727 Sump at Rocky Mountain Arsenal

Final Decision Document for the Interim Response Action for Building 1727 Sump at Rocky Mountain Arsenal
Title Final Decision Document for the Interim Response Action for Building 1727 Sump at Rocky Mountain Arsenal PDF eBook
Author
Publisher
Pages 58
Release 1988
Genre
ISBN

Download Final Decision Document for the Interim Response Action for Building 1727 Sump at Rocky Mountain Arsenal Book in PDF, Epub and Kindle

This interim response action will consist of the treatment and disposal of wastewater from bld1727 sum to mitigate 1) Any future release of contaminated water and 2) The potential adverse affects associated with a release of contaminated water. In addition, this IRA will reduce the mobility, toxicity, and volume of contaminate water in the sump. This final decision document provides summaries of: 1. Alternatives considered 2. Significant events leading to the initiation of the IRA 3. The IRA project 4. The applicable or relevant and appropriate requirements, standards, criteria, or limitations (ARAR's) associated with the program. The preferred action is to pump and treat with existing activated alumina/granular activated carbon treatment system.

Litigation Technical Support and Services, Rocky Mountain Arsenal (basis F Wastes)

Litigation Technical Support and Services, Rocky Mountain Arsenal (basis F Wastes)
Title Litigation Technical Support and Services, Rocky Mountain Arsenal (basis F Wastes) PDF eBook
Author United States. Environmental Protection Agency
Publisher
Pages 600
Release 1989
Genre Hazardous wastes
ISBN

Download Litigation Technical Support and Services, Rocky Mountain Arsenal (basis F Wastes) Book in PDF, Epub and Kindle

Government Reports Announcements & Index

Government Reports Announcements & Index
Title Government Reports Announcements & Index PDF eBook
Author
Publisher
Pages 792
Release 1995
Genre Science
ISBN

Download Government Reports Announcements & Index Book in PDF, Epub and Kindle