Impacts of Replacing a Tight Diamond Interchange with a SPUI

Impacts of Replacing a Tight Diamond Interchange with a SPUI
Title Impacts of Replacing a Tight Diamond Interchange with a SPUI PDF eBook
Author
Publisher
Pages 71
Release 2015
Genre Express highway interchanges
ISBN

Download Impacts of Replacing a Tight Diamond Interchange with a SPUI Book in PDF, Epub and Kindle

Tight diamond interchanges (TDI) and single point urban interchanges (SPUIs) are generally types of interchanges that can be used interchangeably in areas where right-of-way is constrained. There are limited amount of research conducted regarding the operational analysis and comparison of these two interchanges. The research that has been done regarding this topic are outdated and generally conclude that SPUIs perform better or about the same. Without knowing the true performances of the two interchange designs, it would make it difficult for engineers and planners to choose between the two interchanges. This research study will use the current updated version of the micro-simulation software, PTV VISSIM to analyze and compare the performance of the SPUI and the tight diamond interchange. The research will look at reconstructing a current tight diamond interchange into a SPUI in Wilsonville, Oregon to see how it will perform. The analysis was conducted for 7 varying volume levels for both the interchanges including the existing volume conditions. The volume conditions include multiplying the ramp volumes by 0.75, 1.25, and 1.4 as well as doing the same for the eastbound and westbound movements. The results of the analysis shows that the SPUI performs similarly compared to the tight diamond interchange for lower volume conditions, but perform very poorly for higher volume conditions. The SPUI in this location is more sensitive to volume change and does not perform as well as the tight diamond interchange. The SPUI performs better than the TDI by only 1.4 seconds for low ramp volume conditions with regards to average delay per vehicle and performs 31.2 seconds worst for high ramp volume conditions. Therefore, the SPUI should not be implemented at this location as it is not feasible for high volumes and not cost effective. SPUIs should be implemented carefully as it is not suitable for all places.

Single Point Urban Interchange Design and Operations Analysis

Single Point Urban Interchange Design and Operations Analysis
Title Single Point Urban Interchange Design and Operations Analysis PDF eBook
Author Carroll J. Messer
Publisher Transportation Research Board
Pages 116
Release 1991
Genre Technology & Engineering
ISBN 9780309048682

Download Single Point Urban Interchange Design and Operations Analysis Book in PDF, Epub and Kindle

Spaulding Turnpike Improvements NHS-027-1(37), 11238, Newington to Dover, Strafford and Rockingham Counties

Spaulding Turnpike Improvements NHS-027-1(37), 11238, Newington to Dover, Strafford and Rockingham Counties
Title Spaulding Turnpike Improvements NHS-027-1(37), 11238, Newington to Dover, Strafford and Rockingham Counties PDF eBook
Author
Publisher
Pages 754
Release 2007
Genre
ISBN

Download Spaulding Turnpike Improvements NHS-027-1(37), 11238, Newington to Dover, Strafford and Rockingham Counties Book in PDF, Epub and Kindle

Interstate 64/Route 40 Corridor, City of St. Louis and St. Louis County

Interstate 64/Route 40 Corridor, City of St. Louis and St. Louis County
Title Interstate 64/Route 40 Corridor, City of St. Louis and St. Louis County PDF eBook
Author
Publisher
Pages 310
Release 2005
Genre
ISBN

Download Interstate 64/Route 40 Corridor, City of St. Louis and St. Louis County Book in PDF, Epub and Kindle

Operational Effects of Geometrics 2003

Operational Effects of Geometrics 2003
Title Operational Effects of Geometrics 2003 PDF eBook
Author National Research Council (U.S.). Transportation Research Board
Publisher
Pages 84
Release 2003
Genre Highway engineering
ISBN

Download Operational Effects of Geometrics 2003 Book in PDF, Epub and Kindle

SR-26 (Riverdale Road) from 1900 West to Washington Boulevard, Roy, Riverdale, South Ogden and Ogden, Weber County

SR-26 (Riverdale Road) from 1900 West to Washington Boulevard, Roy, Riverdale, South Ogden and Ogden, Weber County
Title SR-26 (Riverdale Road) from 1900 West to Washington Boulevard, Roy, Riverdale, South Ogden and Ogden, Weber County PDF eBook
Author
Publisher
Pages 82
Release 2007
Genre
ISBN

Download SR-26 (Riverdale Road) from 1900 West to Washington Boulevard, Roy, Riverdale, South Ogden and Ogden, Weber County Book in PDF, Epub and Kindle

Traffic Signal Timing Models for Oversaturated Signalized Interchanges

Traffic Signal Timing Models for Oversaturated Signalized Interchanges
Title Traffic Signal Timing Models for Oversaturated Signalized Interchanges PDF eBook
Author Youngchan Kim
Publisher
Pages 140
Release 1992
Genre Traffic congestion
ISBN

Download Traffic Signal Timing Models for Oversaturated Signalized Interchanges Book in PDF, Epub and Kindle

This research report documents the development models for control of signalized diamond interchanges during oversaturated traffic conditions. Oversaturated traffic conditions occur when the average traffic demand exceeds the capacity of the signal system. The dynamic optimization model proposed is the principal product of this research. The control objective of the dynamic model is to provide maximum system productivity as well as minimum delay for a selected roadway system. A special feature predetermined upper limits.