High Flux Isotope Reactor. Quarterly Report, October, November, and December 1979
Title | High Flux Isotope Reactor. Quarterly Report, October, November, and December 1979 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1980 |
Genre | |
ISBN |
Routine reactor operation with four end-of-cycle shutdowns and one scheduled midcycle shutdown resulted in an on-stream time of 93.6% for the quarter. This gave the HFIR an on-stream time for the year of 91.3%. The outer control plates were replaced, and the annual core components inspection was made.
High Flux Isotope Reactor Quarterly Report
Title | High Flux Isotope Reactor Quarterly Report PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1975 |
Genre | |
ISBN |
High Flux Isotope Reactor Quarterly Report, October, November, and December of 1975
Title | High Flux Isotope Reactor Quarterly Report, October, November, and December of 1975 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1975 |
Genre | |
ISBN |
Routine operation of the reactor was resumed with an onstream time of 93.7 percent. An in-reactor test of four journal-type bearings on one control plate was started. These bearings will be operated for four fuel cycles, if no problems develop. The use of chromate salts for corrosion protection in the secondary coolant system was discontinued. Basic operating data are presented.
Energy Research Abstracts
Title | Energy Research Abstracts PDF eBook |
Author | |
Publisher | |
Pages | 472 |
Release | 1993-08 |
Genre | Power resources |
ISBN |
HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, OCTOBER--DECEMBER OF 1966
Title | HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, OCTOBER--DECEMBER OF 1966 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1967 |
Genre | |
ISBN |
Monthly Catalog of United States Government Publications
Title | Monthly Catalog of United States Government Publications PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1994 |
Genre | Government publications |
ISBN |
High Flux Isotope Reactor. Quarterly Report, April, May, and June, 1979
Title | High Flux Isotope Reactor. Quarterly Report, April, May, and June, 1979 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1979 |
Genre | |
ISBN |
Routine reactor operation with four end-of-cycle shutdowns, one scheduled shutdown for analysis of servo problems, and one unscheduled shutdown resulted in an on-stream time of 87.4%. Scheduled reactor component replacement and the semiannual reactor component inspection were completed.