High Flux Isotope Reactor Quarterly Report, January, February, and March, 1976
Title | High Flux Isotope Reactor Quarterly Report, January, February, and March, 1976 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1976 |
Genre | |
ISBN |
Routine reactor operation with only three end-of-cycle shutdowns this quarter resulted in an on-stream time of 95.0 percent. The semiannual reactor component inspection was completed, and the control plates were changed. Basic operating data for the quarter are listed.
HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, JANUARY, FEBRUARY, AND MARCH OF 1967
Title | HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, JANUARY, FEBRUARY, AND MARCH OF 1967 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1967 |
Genre | |
ISBN |
Energy Research Abstracts
Title | Energy Research Abstracts PDF eBook |
Author | |
Publisher | |
Pages | 1364 |
Release | 1989 |
Genre | Power resources |
ISBN |
HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, JANUARY--MARCH 1966
Title | HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, JANUARY--MARCH 1966 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1967 |
Genre | |
ISBN |
ERDA Energy Research Abstracts
Title | ERDA Energy Research Abstracts PDF eBook |
Author | United States. Energy Research and Development Administration |
Publisher | |
Pages | 852 |
Release | 1977 |
Genre | Medicine |
ISBN |
High Flux Isotope Reactor Quarterly Report, July, August, and September of 1976
Title | High Flux Isotope Reactor Quarterly Report, July, August, and September of 1976 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1977 |
Genre | |
ISBN |
An extended shutdown to replace part of the beryllium reflector reduced the operating time for the quarter to 88 percent and the operating time for the year to 92.9 percent. The semiannual reactor component inspection was completed and the control plates were changed. Basic operating data for the quarter are listed.
High Flux Isotope Reactor. Quarterly Report, January, February, and March 1981
Title | High Flux Isotope Reactor. Quarterly Report, January, February, and March 1981 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1982 |
Genre | |
ISBN |
Routine reactor operation with four end-of-cycle shutdowns and two unscheduled shutdowns resulted in an on-stream time of 94.9% for the quarter.