Routine reactor operation with four end-of-cycle shutdowns, one scheduled shutdown for analysis of servo problems, and one unscheduled shutdown resulted in an on-stream time of 87.4%. Scheduled reactor component replacement and the semiannual reactor component inspection were completed.
HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, APRIL--JUNE 1967
Title | HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, APRIL--JUNE 1967 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1967 |
Genre | |
ISBN |
Energy Research Abstracts
Title | Energy Research Abstracts PDF eBook |
Author | |
Publisher | |
Pages | 876 |
Release | 1986 |
Genre | Power resources |
ISBN |
HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, APRIL--JUNE 1966
Title | HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, APRIL--JUNE 1966 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1967 |
Genre | |
ISBN |
High Flux Isotope Reactor. Quarterly Report, October, November, and December 1979
Title | High Flux Isotope Reactor. Quarterly Report, October, November, and December 1979 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1980 |
Genre | |
ISBN |
Routine reactor operation with four end-of-cycle shutdowns and one scheduled midcycle shutdown resulted in an on-stream time of 93.6% for the quarter. This gave the HFIR an on-stream time for the year of 91.3%. The outer control plates were replaced, and the annual core components inspection was made.
High Flux Isotope Reactor. Quarterly Report, April, May, and June 1981
Title | High Flux Isotope Reactor. Quarterly Report, April, May, and June 1981 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1982 |
Genre | |
ISBN |
Routine reactor operation with four end-of-cycle shutdowns resulted in an on-stream time of 92.3% for the quarter. The outer control pates were changed and a semi-annual core component inspection made.
Oak Ridge Research Reactor. Quarterly Report, April-June 1979
Title | Oak Ridge Research Reactor. Quarterly Report, April-June 1979 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1979 |
Genre | |
ISBN |
The ORR operated at an average power level of 29.9 MW for 77.9% of the time during April, May, and June of 1979. The reactor was shut down on seven occasions, two of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for operation 86.5% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature.