Griffith Energy Project, Natural Gas Fired, Combined Cycle Power Plant, Interconnection with WPA's Pacific Northwest-Pacific Southwest Intertie and Parker-Davis Transmission Systems
Title | Griffith Energy Project, Natural Gas Fired, Combined Cycle Power Plant, Interconnection with WPA's Pacific Northwest-Pacific Southwest Intertie and Parker-Davis Transmission Systems PDF eBook |
Author | |
Publisher | |
Pages | 370 |
Release | 1999 |
Genre | |
ISBN |
Third Powerplant
Title | Third Powerplant PDF eBook |
Author | |
Publisher | |
Pages | 12 |
Release | 1969 |
Genre | Grand Coulee Dam (Wash.) |
ISBN |
The History of Large Federal Dams
Title | The History of Large Federal Dams PDF eBook |
Author | David Billington |
Publisher | CreateSpace |
Pages | 626 |
Release | 2013-04-02 |
Genre | |
ISBN | 9781483966137 |
This history explores the story of federal contributions to dam planning, design, and construction by carefully selecting those dams and river systems that seem particularly critical to the story. The history also addresses some of the negative environmental consequences of dam-building, a series of problems that today both Reclamation and the U.S. Army Corps of Engineers seek to resolve.
Columbia Basin Joint Investigations
Title | Columbia Basin Joint Investigations PDF eBook |
Author | |
Publisher | |
Pages | 462 |
Release | 1945 |
Genre | Agriculture |
ISBN |
Analysis of Expansion of the Pacific Northwest-Southwest Intertie System
Title | Analysis of Expansion of the Pacific Northwest-Southwest Intertie System PDF eBook |
Author | R.W. Beck and Associates |
Publisher | |
Pages | 300 |
Release | 1980 |
Genre | Electric lines |
ISBN |
Preliminary Report on an Interconnection Between the Power Systems of the Bonneville Power Administration and the Central Valley Project
Title | Preliminary Report on an Interconnection Between the Power Systems of the Bonneville Power Administration and the Central Valley Project PDF eBook |
Author | United States. Bureau of Reclamation |
Publisher | |
Pages | 112 |
Release | 1949 |
Genre | Interconnected electric utility systems |
ISBN |
Pinon Pine Power Project. Annual Report, January 1--December 31, 1996
Title | Pinon Pine Power Project. Annual Report, January 1--December 31, 1996 PDF eBook |
Author | |
Publisher | |
Pages | 100 |
Release | 1997 |
Genre | |
ISBN |
This annual report has been prepared to present the status of the Pinon Pine Power Project, a nominal 107 MWe (gross) coal-fired integrated gasification combined-cycle (IGCC) power plant addition to Sierra Pacific Power Company's (SPPCo) system. This project will also serve as a demonstration project cost-shared by the US Department of Energy (DOE) and SPPCo under DOE's Clean Coal Technology (CCT) Program. The goal of the CCT Program is to demonstrate advanced coal utilization technologies that are energy efficient, reliable and able to achieve substantial reductions in emissions as compared with existing coal technologies. The Pinon Pine Power Project will demonstrate an IGCC system utilizing the Kellogg-Rust-Westinghouse (KRW) fluidized-bed gasification process operating in an air-blown mode with in-bed desulfurization and hot gas clean-up with a western bituminous coal as the design fuel. Testing will also be performed on a high-sulfur eastern coal. The Pinon Pine Power Project will be constructed and operated at SPPCo's Tracy Power Station, an existing power generation facility located on a rural 724-acre plot approximately 17 miles east of Reno, NV. This new unit is designated as Tracy Unit No. 4.