Design of TVA Projects: Civil and structural design
Title | Design of TVA Projects: Civil and structural design PDF eBook |
Author | |
Publisher | |
Pages | 466 |
Release | 1952 |
Genre | Flood control |
ISBN |
Design of TVA Projects: Civil and structural design
Title | Design of TVA Projects: Civil and structural design PDF eBook |
Author | Tennessee Valley Authority |
Publisher | |
Pages | 466 |
Release | 1952 |
Genre | Hydroelectric power plants |
ISBN |
Design of TVA Projects
Title | Design of TVA Projects PDF eBook |
Author | Tennessee Valley Authority |
Publisher | |
Pages | 472 |
Release | 1952 |
Genre | Flood control |
ISBN |
Design of TVA Projects
Title | Design of TVA Projects PDF eBook |
Author | |
Publisher | |
Pages | 476 |
Release | 1952 |
Genre | Hydroelectric power plants |
ISBN |
Civil and Structural Design
Title | Civil and Structural Design PDF eBook |
Author | Estados Unidos. Tennessee Valley Authority |
Publisher | |
Pages | 468 |
Release | 1952 |
Genre | Diseño de estructuras |
ISBN |
Design of TVA Projects: Electrical design of hydro plants
Title | Design of TVA Projects: Electrical design of hydro plants PDF eBook |
Author | Tennessee Valley Authority |
Publisher | |
Pages | 476 |
Release | 1953 |
Genre | Electrical engineering |
ISBN |
This is the second of three volumes comprising the Design of TVA Projects and is one of a planned series of special reports recording the experience of TVA in carrying out the major phases of its engineering and construction program. It undertakes to explain the engineering work involved in the design of electrical installations for primary water control stations of TVA, including switch-yards constructed at the generating stations but not transmission lines and substations.
The Upper Holston Projects
Title | The Upper Holston Projects PDF eBook |
Author | Tennessee Valley Authority |
Publisher | |
Pages | 1270 |
Release | 1958 |
Genre | Dams |
ISBN |
The development from inception through initial operation of four major TVA water control projects in the upper or northeastern part of the Tennessee Valley - Watauga, South Holston, Boone, and Fort Patrick Henry, collectively designated Upper Holston - is presented in this technical report, The Upper Holston Projects. Improvement of the minor Wilbur project immediately below Watauga is included as an appendix. The manuscript was compiled from basic planning, design, construction and other development of the projects and comprises a record of the more important facts concerning the planning, design, construction, costs, and initial operations of these projects by the TVA.