Basewide Remedial Investigation/feasbibility Study: Baseline ecological risk assessment. Text, tables, and plates. Appendixes (2 v.)
Title | Basewide Remedial Investigation/feasbibility Study: Baseline ecological risk assessment. Text, tables, and plates. Appendixes (2 v.) PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1994 |
Genre | Environmental auditing |
ISBN |
Basewide Remedial Investigation/feasbibility Study: Remedial investigation. Introduction, basewide hydrogeologic characterization text, tables and plates. Basewide hydrogeologic characterization appendixes. Basewide surface water outfall investigation. Basewide background soil investigation, basewide storm drain and sanitary sewer investigation. Sites 2 and 12, text, tables and plates. Sites 2 and 12, appendixes. Sites 16 and 17. Site 3. Site 31. Site 39 text, tables, and plates. Site 39 appendixes (11 v.)
Title | Basewide Remedial Investigation/feasbibility Study: Remedial investigation. Introduction, basewide hydrogeologic characterization text, tables and plates. Basewide hydrogeologic characterization appendixes. Basewide surface water outfall investigation. Basewide background soil investigation, basewide storm drain and sanitary sewer investigation. Sites 2 and 12, text, tables and plates. Sites 2 and 12, appendixes. Sites 16 and 17. Site 3. Site 31. Site 39 text, tables, and plates. Site 39 appendixes (11 v.) PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1994 |
Genre | Environmental auditing |
ISBN |
Incorporating Ecological Risk Assessment Into Remedial Investigation/feasibility Study Work Plans
Title | Incorporating Ecological Risk Assessment Into Remedial Investigation/feasibility Study Work Plans PDF eBook |
Author | United States. Department of Energy. Office of Environmental Guidance |
Publisher | |
Pages | 220 |
Release | 1994 |
Genre | Ecological risk assessment |
ISBN |
This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites--P. I-3.
Incorporating Ecological Risk Assessment Into Remedial Investigation
Title | Incorporating Ecological Risk Assessment Into Remedial Investigation PDF eBook |
Author | |
Publisher | |
Pages | 221 |
Release | 1994 |
Genre | |
ISBN |
This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.
Basewide Remedial Investigation/feasbibility Study: Feasibility study. Sites 2 and 12, sites 16 and 17, site 3. Site 31, site 39 (2 v.)
Title | Basewide Remedial Investigation/feasbibility Study: Feasibility study. Sites 2 and 12, sites 16 and 17, site 3. Site 31, site 39 (2 v.) PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1994 |
Genre | Environmental auditing |
ISBN |
Basewide Remedial Investigation/feasbibility Study: Baseline human health risk assessment
Title | Basewide Remedial Investigation/feasbibility Study: Baseline human health risk assessment PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1994 |
Genre | Environmental auditing |
ISBN |
Woodbridge Research Facility Remedial Investigation/Feasibility Study; Remedial Investigation, Volume 1 - Text, Tables, and Figures
Title | Woodbridge Research Facility Remedial Investigation/Feasibility Study; Remedial Investigation, Volume 1 - Text, Tables, and Figures PDF eBook |
Author | |
Publisher | |
Pages | 0 |
Release | 1997 |
Genre | |
ISBN |
RThe U.S. Army Woodbridge Research Facility (WRF) was used in the past as a major military communications center and a research and development laboratory where electromagnetic pulse energy was tested on military and other equipment. WRF is presently an inactive facility pursuant to the 1991 Base Realignment and Closure list. Past investigation activities indicate that polychlorinated biphenyl compounds (PCBs) are the primary chemicals of concern. A Remedial Investigation (RI) was performed to evaluate the nature and extent of contamination at WRF. Surface soil, subsurface soil, surface water/sediment, and storm water runoff samples were collected as part of the RI. Groundwater monitoring wells were installed and sampled to evaluate the quality of groundwater at WRF. A conceptual hydrogeologic model was developed using water levels obtained from the monitoring wells. A wetland delineation was performed to map the wetland areas of WRF. Human health and ecological risk assessments were performed to evaluate the potential risk to human and ecological receptors from exposures to chemicals present at WRF.