This document presents the as-run analysis of the AGR-1 irradiation experiment. AGR-1 is the first of eight planned irradiations for the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. Funding for this program is provided by the US Department of Energy (DOE) as part of the Next-Generation Nuclear Plant (NGNP) project. The objectives of the AGR-1 experiment are: 1. To gain experience with multi-capsule test train design, fabrication, and operation with the intent to reduce the probability of capsule or test train failure in subsequent irradiation tests. 2. To irradiate fuel produced in conjunction with the AGR fuel process development effort. 3. To provide data that will support the development of an understanding of the relationship between fuel fabrication processes, fuel product properties, and irradiation performance. In order to achieve the test objectives, the AGR-1 experiment was irradiated in the B-10 position of the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL) for a total duration of 620 effective full power days of irradiation. Irradiation began on December 24, 2006 and ended on November 6, 2009 spanning 13 ATR cycles and approximately three calendar years. The test contained six independently controlled and monitored capsules. Each capsule contained 12 compacts of a single type, or variant, of the AGR coated fuel. No fuel particles failed during the AGR-1 irradiation. Final burnup values on a per compact basis ranged from 11.5 to 19.6 %FIMA, while fast fluence values ranged from 2.21 to 4.39 x 1025 n/m2 (E>0.18 MeV). We'll say something here about temperatures once thermal recalc is done. Thermocouples performed well, failing at a lower rate than expected. At the end of the irradiation, nine of the originally-planned 19 TCs were considered functional. Fission product release-to-birth (R/B) ratios were quite low. In most capsules, R/B values at the end of the irradiation were at or below 10-7 with only one capsule significantly exceeding this value. A maximum R/B of around 2 x 10-7 was reached at the end of the irradiation in Capsule 5. Several shakedown issues were encountered and resolved during the first three cycles. These include the repair of minor gas line leaks; repair of faulty gas line valves; the need to position moisture monitors in regions of low radiation fields for proper functioning; the enforcement of proper on-line data storage and backup, the need to monitor thermocouple performance, correcting for detector spectral gain shift, and a change in the mass flow rate range of the neon flow controllers.

AGR-1 Irradiation Test Final As-Run Report, Rev 2

AGR-1 Irradiation Test Final As-Run Report, Rev 2
Title AGR-1 Irradiation Test Final As-Run Report, Rev 2 PDF eBook
Author
Publisher
Pages
Release 2015
Genre
ISBN

Download AGR-1 Irradiation Test Final As-Run Report, Rev 2 Book in PDF, Epub and Kindle

This document presents the as-run analysis of the AGR-1 irradiation experiment. AGR-1 is the first of eight planned irradiations for the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. Funding for this program is provided by the US Department of Energy (DOE) as part of the Next-Generation Nuclear Plant (NGNP) project. The objectives of the AGR-1 experiment are: 1. To gain experience with multi-capsule test train design, fabrication, and operation with the intent to reduce the probability of capsule or test train failure in subsequent irradiation tests. 2. To irradiate fuel produced in conjunction with the AGR fuel process development effort. 3. To provide data that will support the development of an understanding of the relationship between fuel fabrication processes, fuel product properties, and irradiation performance. In order to achieve the test objectives, the AGR-1 experiment was irradiated in the B-10 position of the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL) for a total duration of 620 effective full power days of irradiation. Irradiation began on December 24, 2006 and ended on November 6, 2009 spanning 13 ATR cycles and approximately three calendar years. The test contained six independently controlled and monitored capsules. Each capsule contained 12 compacts of a single type, or variant, of the AGR coated fuel. No fuel particles failed during the AGR-1 irradiation. Final burnup values on a per compact basis ranged from 11.5 to 19.6 %FIMA, while fast fluence values ranged from 2.21 to 4.39?1025 n/m2 (E>0.18 MeV). We'll say something here about temperatures once thermal recalc is done. Thermocouples performed well, failing at a lower rate than expected. At the end of the irradiation, nine of the originally-planned 19 TCs were considered functional. Fission product release-to-birth (R/B) ratios were quite low. In most capsules, R/B values at the end of the irradiation were at or below 10-7 with only one capsule significantly exceeding this value. A maximum R/B of around 2?10-7 was reached at the end of the irradiation in Capsule 5. Several shakedown issues were encountered and resolved during the first three cycles. These include the repair of minor gas line leaks; repair of faulty gas line valves; the need to position moisture monitors in regions of low radiation fields for proper functioning; the enforcement of proper on-line data storage and backup, the need to monitor thermocouple performance, correcting for detector spectral gain shift, and a change in the mass flow rate range of the neon flow controllers.

AGR-1 Irradiation Test Final As-Run Report

AGR-1 Irradiation Test Final As-Run Report
Title AGR-1 Irradiation Test Final As-Run Report PDF eBook
Author
Publisher
Pages
Release 2012
Genre
ISBN

Download AGR-1 Irradiation Test Final As-Run Report Book in PDF, Epub and Kindle

This document presents the as-run analysis of the AGR-1 irradiation experiment. AGR-1 is the first of eight planned irradiations for the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. Funding for this program is provided by the US Department of Energy (DOE) as part of the Next-Generation Nuclear Plant (NGNP) project. The objectives of the AGR-1 experiment are: 1. To gain experience with multi-capsule test train design, fabrication, and operation with the intent to reduce the probability of capsule or test train failure in subsequent irradiation tests. 2. To irradiate fuel produced in conjunction with the AGR fuel process development effort. 3. To provide data that will support the development of an understanding of the relationship between fuel fabrication processes, fuel product properties, and irradiation performance. In order to achieve the test objectives, the AGR-1 experiment was irradiated in the B-10 position of the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL) for a total duration of 620 effective full power days of irradiation. Irradiation began on December 24, 2006 and ended on November 6, 2009 spanning 13 ATR cycles and approximately three calendar years. The test contained six independently controlled and monitored capsules. Each capsule contained 12 compacts of a single type, or variant, of the AGR coated fuel. No fuel particles failed during the AGR-1 irradiation. Final burnup values on a per compact basis ranged from 11.5 to 19.6 %FIMA, while fast fluence values ranged from 2.21 to 4.39?1025 n/m2 (E>0.18 MeV). We'll say something here about temperatures once thermal recalc is done. Thermocouples performed well, failing at a lower rate than expected. At the end of the irradiation, nine of the originally-planned 19 TCs were considered functional. Fission product release-to-birth (R/B) ratios were quite low. In most capsules, R/B values at the end of the irradiation were at or below 10-7 with only one capsule significantly exceeding this value. A maximum R/B of around 2?10-7 was reached at the end of the irradiation in Capsule 5. Several shakedown issues were encountered and resolved during the first three cycles. These include the repair of minor gas line leaks; repair of faulty gas line valves; the need to position moisture monitors in regions of low radiation fields for proper functioning; the enforcement of proper on-line data storage and backup, the need to monitor thermocouple performance, correcting for detector spectral gain shift, and a change in the mass flow rate range of the neon flow controllers.

The AGR-1 Irradiation -Objectives, Success Criteria and Risk Management

The AGR-1 Irradiation -Objectives, Success Criteria and Risk Management
Title The AGR-1 Irradiation -Objectives, Success Criteria and Risk Management PDF eBook
Author James Kendall
Publisher
Pages
Release 2006
Genre
ISBN

Download The AGR-1 Irradiation -Objectives, Success Criteria and Risk Management Book in PDF, Epub and Kindle

The AGR-1 experiment being conducted by the US Department of Energy Advanced Gas Reactor Fuel Development and Qualification Program (AGR fuel program) will irradiate TRISO-coated particle fuel in compacts under conditions representative of a Very High Temperature Reactor (VHTR) core. The anticipated fuel performance requirements of a prismatic core VHTR significantly exceed established TRISO-coated particle fuel capability in terms of burnup, temperature and fast fluence. AGR-1 is the first in a planned series of eight irradiations leading to the qualification of low enriched uranium coated particle fuel compacts for service in a VHTR, as identified in an overall Technical Program Plan produced at the beginning of the program . The AGR-1 experiment is scheduled for insertion in the Advanced Test Reactor (ATR) in the first quarter of fiscal year 2007 and to be irradiated for a period of up to approximately two and a half years. The irradiation rig, designated a "test train" is designed to provide six independently controlled (for temperature) and monitored (for fission product gas release) capsules containing fuel samples.

AGR-1 Data Qualification Report

AGR-1 Data Qualification Report
Title AGR-1 Data Qualification Report PDF eBook
Author
Publisher
Pages
Release 2010
Genre
ISBN

Download AGR-1 Data Qualification Report Book in PDF, Epub and Kindle

ABSTRACT Projects for the very high temperature reactor (VHTR) Technology Development Office (TDO) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor experiment (AGR-1), the processing of these data within NDMAS, and reports the qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. They include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent quality assurance program. The NDMAS database processing and qualification status of the following five data streams is reported in this document: 1. Fuel fabrication data. All data have been processed into the NDMAS database and qualified (1,819 records). 2. Fuel irradiation data. Data from all 13 AGR-1 reactor cycles have been processed into the NDMAS database and tested. Of these, 85% have been qualified and 15% have failed NDMAS accuracy testing. 3. FPMS data. Reprocessed (January 2010) data from all 13 AGR-1 reactor cycles have been processed into the database and capture tested. Final qualification of these data will be recorded after QA approval of an Engineering Calculations and Analysis Report currently in review. 4. ATR Operating Conditions Data. Data for all AGR-1 cycles have been stored and capture tested. These data, which come from outside the VHTR program, are assumed to be qualified by ATR quality control procedures. 5. Neutronics and Thermal Modeling Data. NDMAS processing is in progress. These data will not be qualified by NDMAS.

AGR-1 Data Qualification Interim Report

AGR-1 Data Qualification Interim Report
Title AGR-1 Data Qualification Interim Report PDF eBook
Author
Publisher
Pages
Release 2009
Genre
ISBN

Download AGR-1 Data Qualification Interim Report Book in PDF, Epub and Kindle

Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010.

Data Compilation for AGR-1 Pre-Production Test

Data Compilation for AGR-1 Pre-Production Test
Title Data Compilation for AGR-1 Pre-Production Test PDF eBook
Author
Publisher
Pages
Release 2006
Genre
ISBN

Download Data Compilation for AGR-1 Pre-Production Test Book in PDF, Epub and Kindle

This document is a compilation of characterization data for compact lot NUCO350-75T-Z. This compact lot was fabricated using particle composite NUCO350-75T, which was a composite of three batches of TRISO-coated 350 m natural uranium oxide/uranium carbide kernels (NUCO). The compacts and coated particles were produced as part of a development effort at ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program. The kernels were obtained from BWXT and were identified as composite G73B-NU-69300. The BWXT kernel lot G73B-NU-69300 was riffled into sublots for characterization and coating. The ORNL identification for these kernel sublots was NUCO350-## (where ## were a series of integers beginning with 01). NUCO350-75T-Z was produced as part of the ORNL AGR development effort and is not fully representative of a final product. This compact lot was the first run through of the entire ORNL AGR-1 irradiation test fuel production process involving coating, characterization, and compacting of TRISO-coated 350 m NUCO. The results of this exercise were used to fine tune the irradiation test fuel production process and as a basis for the decision to proceed with the production of the baseline fuel for the AGR-1 irradiation test.