The Savannah River Site and the Processing Facility Being Built to Prepare Its Radioactive Waste for Permanent Disposal

The Savannah River Site and the Processing Facility Being Built to Prepare Its Radioactive Waste for Permanent Disposal
Title The Savannah River Site and the Processing Facility Being Built to Prepare Its Radioactive Waste for Permanent Disposal PDF eBook
Author
Publisher
Pages 5
Release 1986
Genre
ISBN

Download The Savannah River Site and the Processing Facility Being Built to Prepare Its Radioactive Waste for Permanent Disposal Book in PDF, Epub and Kindle

This presentation provides an appreciation for the tremendous chemical processing challenges met in the development of the Defense Waste Process Facility (DWPF) process. The DWPF is presently under construction and is due for completion in 1989. Before radioactive waste is introduced to the DWPF in late 1989, the remote operation of all equipment and all process steps must be demonstrated.

Savannah River Site Waste Management

Savannah River Site Waste Management
Title Savannah River Site Waste Management PDF eBook
Author
Publisher
Pages 766
Release 1995
Genre Environmental impact statements
ISBN

Download Savannah River Site Waste Management Book in PDF, Epub and Kindle

Savannah River Plant High Level Waste: Waste Form Selection, Aiken

Savannah River Plant High Level Waste: Waste Form Selection, Aiken
Title Savannah River Plant High Level Waste: Waste Form Selection, Aiken PDF eBook
Author
Publisher
Pages 52
Release 1982
Genre
ISBN

Download Savannah River Plant High Level Waste: Waste Form Selection, Aiken Book in PDF, Epub and Kindle

Nuclear Waste

Nuclear Waste
Title Nuclear Waste PDF eBook
Author David C. Trimble
Publisher DIANE Publishing
Pages 44
Release 2011-05
Genre Technology & Engineering
ISBN 1437939643

Download Nuclear Waste Book in PDF, Epub and Kindle

Decades of nuclear materials production at the Dept. of Energy¿s (DoE) Savannah River Site in S. Carolina have left 37 million gallons of radioactive liquid waste in 49 underground storage tanks. In Dec. 2008, DoE entered into a contract with Savannah River Remediation, LLC (SRR) to close, by 2017, 22 of the highest-risk tanks at a cost of $3.2 billion. This report assessed: (1) DoE¿s cost estimates and schedule for closing the tanks at the Savannah River Site; and (2) the primary challenges, if any, to closing the tanks and the steps DoE has taken to address them. The auditor visited the Savannah River Site and reviewed tank closure documents. Includes recommendations. Charts and tables. This is a print on demand report.

Defense waste processing facility, Savannah River plant, Aiken, S.C.

Defense waste processing facility, Savannah River plant, Aiken, S.C.
Title Defense waste processing facility, Savannah River plant, Aiken, S.C. PDF eBook
Author
Publisher
Pages 600
Release 1981
Genre
ISBN

Download Defense waste processing facility, Savannah River plant, Aiken, S.C. Book in PDF, Epub and Kindle

Savannah River Plant, Defense Waste Processing Facility

Savannah River Plant, Defense Waste Processing Facility
Title Savannah River Plant, Defense Waste Processing Facility PDF eBook
Author
Publisher
Pages 608
Release 1982
Genre
ISBN

Download Savannah River Plant, Defense Waste Processing Facility Book in PDF, Epub and Kindle

Savannah River Site, High-level Waste Tank Closure

Savannah River Site, High-level Waste Tank Closure
Title Savannah River Site, High-level Waste Tank Closure PDF eBook
Author
Publisher
Pages 40
Release 2002
Genre
ISBN

Download Savannah River Site, High-level Waste Tank Closure Book in PDF, Epub and Kindle