Review of the Revised Hood River Production Program Master Plan

Review of the Revised Hood River Production Program Master Plan
Title Review of the Revised Hood River Production Program Master Plan PDF eBook
Author United States. Independent Scientific Review Panel
Publisher
Pages
Release 2008
Genre
ISBN

Download Review of the Revised Hood River Production Program Master Plan Book in PDF, Epub and Kindle

2019 Step Review of the Hood River Production Program

2019 Step Review of the Hood River Production Program
Title 2019 Step Review of the Hood River Production Program PDF eBook
Author United States. Independent Scientific Review Panel
Publisher
Pages 23
Release 2019
Genre Chinook salmon
ISBN

Download 2019 Step Review of the Hood River Production Program Book in PDF, Epub and Kindle

Revised Master Plan for the Hood River Production Program, Technical Report 2008

Revised Master Plan for the Hood River Production Program, Technical Report 2008
Title Revised Master Plan for the Hood River Production Program, Technical Report 2008 PDF eBook
Author
Publisher
Pages 428
Release 2008
Genre
ISBN

Download Revised Master Plan for the Hood River Production Program, Technical Report 2008 Book in PDF, Epub and Kindle

The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP's defined smolt-to-adult (SAR) survival rate guidelines. The observed low SAR was due to precocity, straying, and incidence of BKD in the spring Chinook program; which ultimately led to the program's inability to achieve the subbasin's overly optimistic biological fish objectives. The summer steelhead hatchery program was not providing the fishery or population benefits anticipated and will be discontinued. The winter steelhead program was performing as planned and no changes are foreseen. This updated Master Plan addresses the several proposed changes to the existing HRPP, which are described.

2020 Response Review of the Hood River Production Program

2020 Response Review of the Hood River Production Program
Title 2020 Response Review of the Hood River Production Program PDF eBook
Author United States. Independent Scientific Review Panel
Publisher
Pages 23
Release 2020
Genre Chinook salmon
ISBN

Download 2020 Response Review of the Hood River Production Program Book in PDF, Epub and Kindle

Hood River Production Master Plan

Hood River Production Master Plan
Title Hood River Production Master Plan PDF eBook
Author
Publisher
Pages 102
Release 1991
Genre
ISBN

Download Hood River Production Master Plan Book in PDF, Epub and Kindle

The Northwest Power Planning Council's 1987 Columbia River Fish and Wildlife Program authorizes the development of artificial production facilities to raise chinook salmon and steelhead for enhancement in the Hood, Umatilla, Walla Walla, Grande Ronde and Imnaha rivers and elsewhere. On February 26, 1991 the Council agreed to disaggregate Hood River from the Northeast Oregon Hatchery Project, and instead, link the Hood River Master Plan (now the Hood River Production Plan) to the Pelton Ladder Project (Pelton Ladder Master Plan 1991).

Hood River Production Master Plan

Hood River Production Master Plan
Title Hood River Production Master Plan PDF eBook
Author
Publisher
Pages 196
Release 1991
Genre
ISBN

Download Hood River Production Master Plan Book in PDF, Epub and Kindle

Energy and Water Development Appropriations for 2014

Energy and Water Development Appropriations for 2014
Title Energy and Water Development Appropriations for 2014 PDF eBook
Author United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development
Publisher
Pages 892
Release 2013
Genre Federal aid to energy development
ISBN

Download Energy and Water Development Appropriations for 2014 Book in PDF, Epub and Kindle