Routine reactor operation with four end-of-cycle shutdowns resulted in an on-stream time of 92.3% for the quarter. The outer control pates were changed and a semi-annual core component inspection made.
Energy Research Abstracts
Title | Energy Research Abstracts PDF eBook |
Author | |
Publisher | |
Pages | 564 |
Release | 1990 |
Genre | Power resources |
ISBN |
High Flux Isotope Reactor. Quarterly Report, January, February, and March 1981
Title | High Flux Isotope Reactor. Quarterly Report, January, February, and March 1981 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1982 |
Genre | |
ISBN |
Routine reactor operation with four end-of-cycle shutdowns and two unscheduled shutdowns resulted in an on-stream time of 94.9% for the quarter.
HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, APRIL--JUNE 1967
Title | HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, APRIL--JUNE 1967 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1967 |
Genre | |
ISBN |
Oak Ridge Research Reactor Quarterly Report, April, May, and June 1981
Title | Oak Ridge Research Reactor Quarterly Report, April, May, and June 1981 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1982 |
Genre | |
ISBN |
The ORR operated at an average power level of 29.8 MW for 90.7% of the time during April, May, and June 1981. The reactor was shut down on eight occasions, one of which was unscheduled. Reactor downtime needed for refueling, maintenance, and checks was normal, with the reactor remaining available for operation 91.6% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature. In-service inspection completed during the quarter is described.
HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, APRIL--JUNE 1966
Title | HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, APRIL--JUNE 1966 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1967 |
Genre | |
ISBN |
High Flux Isotope Reactor. Quarterly Report, April, May, and June, 1979
Title | High Flux Isotope Reactor. Quarterly Report, April, May, and June, 1979 PDF eBook |
Author | |
Publisher | |
Pages | |
Release | 1979 |
Genre | |
ISBN |
Routine reactor operation with four end-of-cycle shutdowns, one scheduled shutdown for analysis of servo problems, and one unscheduled shutdown resulted in an on-stream time of 87.4%. Scheduled reactor component replacement and the semiannual reactor component inspection were completed.