Final Engineering Evaluation and Cost Analysis Investigation Work Plan

Final Engineering Evaluation and Cost Analysis Investigation Work Plan
Title Final Engineering Evaluation and Cost Analysis Investigation Work Plan PDF eBook
Author
Publisher
Pages 0
Release 1995
Genre Camp Grant (Ill.)
ISBN

Download Final Engineering Evaluation and Cost Analysis Investigation Work Plan Book in PDF, Epub and Kindle

"Under a contract with U.S. Army Corps of Engineers - Huntsville Division (CEHND), Parsons Engineering Science, Inc. (Parsons ES) will prepare an Engineering Evaluation and Cost Analysis (EE/CA) for the former Camp Grant Rifle Range in New Milford, Illinois. The project includes an unexploded ordnance survey, soil sampling, and unexploded ordnance sampling to a depth of 2 feet, preparation of an EE/CA and EE/CA Action Memorandum. This document is the Final Work Plan for the EE/CA field investigation. Preceding the Parsons ES work, UXB International, Inc. (UXB), under a separate contract with CEHND, will perform a Time-Critical Removal Action (TCRA) to a depth of 6 inches for the entire Camp Grant Rifle Range site. In January 1995, UXB prepared a TCRA Work Plan." --Preface.

Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Site ST14

Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Site ST14
Title Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Site ST14 PDF eBook
Author
Publisher
Pages 125
Release 1994
Genre
ISBN

Download Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Site ST14 Book in PDF, Epub and Kindle

This work plan was prepared by Engineering-Science, Inc. (ES) and describes the scope of work required for the collection and analysis of data to complete an engineering evaluation/cost analysis (BE/CA) in support of a risk-based remediation decision for soil and ground water contaminated with JP-4 fuel hydrocarbons at Site STl4 at Carswell Air Force Base (AFB), Fort Worth, Texas. Site STl4 consists of two separate sites: Site STl4A, the Fuel Loading Area, and Site STl4B, the petroleum, oil, and lubricant (POL) tank farm. This work plan is the equivalent of a treatability study test design (TSTD) for the field test of the risk-based approach for the remediation of Site ST 14. This innovative technology demonstration is sponsored by the Air Force Center for Environmental Excellence (AFCEE) at Brooks AFB, Texas, under contract F41624-93-C-8044, "Risk-Based Approach to Fuel Spill Remediation." The Site STl4 demonstration is a component of a multi-site initiative being sponsored by AFCEE to demonstrate how quantitative fate and transport calculations and risk information based on site-specific data can be integrated to quickly determine the type and magnitude of remedial action required at a site to minimize contaminant migration and receptor risks.

Installation Restoration Program, Engineering Evaluation/Cost Analysis Field Investigation Work Plan - IRP Sites No. 7 and No. 8, 120th Montana Air National Guard, Great Falls, Montana

Installation Restoration Program, Engineering Evaluation/Cost Analysis Field Investigation Work Plan - IRP Sites No. 7 and No. 8, 120th Montana Air National Guard, Great Falls, Montana
Title Installation Restoration Program, Engineering Evaluation/Cost Analysis Field Investigation Work Plan - IRP Sites No. 7 and No. 8, 120th Montana Air National Guard, Great Falls, Montana PDF eBook
Author
Publisher
Pages 229
Release 1997
Genre
ISBN

Download Installation Restoration Program, Engineering Evaluation/Cost Analysis Field Investigation Work Plan - IRP Sites No. 7 and No. 8, 120th Montana Air National Guard, Great Falls, Montana Book in PDF, Epub and Kindle

A field Investigation will be conducted at IRP Sites No. 7 (Dry Well off Corrosion Control Building) and No. 8 (Dry Well off Composite Maintenance Building), Montana Air National Guard, Great Falls International Airport, Great Falls, Montana. The Remedial Investigation (RI), completed in May 1997, recommended that an Engineering Evaluation/Cost Analysis be performed at Sites 7 and 8 to determine the significance of the groundwater contamination, and what remedial measures, if any, should be taken. The field investigation will consist of installing four (4) monitoring wells at each site, collecting and analyzing groundwater from each well, and measuring hydraulic properties of the groundwater. The objectives of this investigation will be to assess the extent of groundwater contamination, to determine the potential risk of the contamination to human health and the environment, and to evaluate removal action alternatives.

Commerce Business Daily

Commerce Business Daily
Title Commerce Business Daily PDF eBook
Author
Publisher
Pages 1828
Release 1999-10
Genre Government purchasing
ISBN

Download Commerce Business Daily Book in PDF, Epub and Kindle

Engineering Evaluation/cost Analysis Work Plan

Engineering Evaluation/cost Analysis Work Plan
Title Engineering Evaluation/cost Analysis Work Plan PDF eBook
Author
Publisher
Pages
Release 1998
Genre Arsenals
ISBN

Download Engineering Evaluation/cost Analysis Work Plan Book in PDF, Epub and Kindle

Master Planned Redevelopment at Camp Parks

Master Planned Redevelopment at Camp Parks
Title Master Planned Redevelopment at Camp Parks PDF eBook
Author
Publisher
Pages 306
Release 2009
Genre
ISBN

Download Master Planned Redevelopment at Camp Parks Book in PDF, Epub and Kindle

Energy and Water Development Appropriations for 1994

Energy and Water Development Appropriations for 1994
Title Energy and Water Development Appropriations for 1994 PDF eBook
Author United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development
Publisher
Pages 580
Release 1993
Genre Nature
ISBN

Download Energy and Water Development Appropriations for 1994 Book in PDF, Epub and Kindle