A Cultural Resources Study of the Proposed CARES Columbia Wind Farm No. 1, Kickatat County, Washington. Appendix C.

A Cultural Resources Study of the Proposed CARES Columbia Wind Farm No. 1, Kickatat County, Washington. Appendix C.
Title A Cultural Resources Study of the Proposed CARES Columbia Wind Farm No. 1, Kickatat County, Washington. Appendix C. PDF eBook
Author
Publisher
Pages
Release 1995
Genre
ISBN

Download A Cultural Resources Study of the Proposed CARES Columbia Wind Farm No. 1, Kickatat County, Washington. Appendix C. Book in PDF, Epub and Kindle

Energy Research Abstracts

Energy Research Abstracts
Title Energy Research Abstracts PDF eBook
Author
Publisher
Pages 626
Release 1995
Genre Power resources
ISBN

Download Energy Research Abstracts Book in PDF, Epub and Kindle

Semiannual, with semiannual and annual indexes. References to all scientific and technical literature coming from DOE, its laboratories, energy centers, and contractors. Includes all works deriving from DOE, other related government-sponsored information, and foreign nonnuclear information. Arranged under 39 categories, e.g., Biomedical sciences, basic studies; Biomedical sciences, applied studies; Health and safety; and Fusion energy. Entry gives bibliographical information and abstract. Corporate, author, subject, report number indexes.

Columbia Wind Farm #1, 25 Megawatt (MW) Wind Power Project in Columbia Hills Area, Kilckitat County

Columbia Wind Farm #1, 25 Megawatt (MW) Wind Power Project in Columbia Hills Area, Kilckitat County
Title Columbia Wind Farm #1, 25 Megawatt (MW) Wind Power Project in Columbia Hills Area, Kilckitat County PDF eBook
Author
Publisher
Pages 304
Release 1995
Genre
ISBN

Download Columbia Wind Farm #1, 25 Megawatt (MW) Wind Power Project in Columbia Hills Area, Kilckitat County Book in PDF, Epub and Kindle

Cultural Resources Assessment of the Kenetech Windpower's Washington Windplant No.1 Project, Klickitat County, Washington. Appendix D to Washington Windplant No.1 EIS. Draft Report

Cultural Resources Assessment of the Kenetech Windpower's Washington Windplant No.1 Project, Klickitat County, Washington. Appendix D to Washington Windplant No.1 EIS. Draft Report
Title Cultural Resources Assessment of the Kenetech Windpower's Washington Windplant No.1 Project, Klickitat County, Washington. Appendix D to Washington Windplant No.1 EIS. Draft Report PDF eBook
Author
Publisher
Pages
Release 1995
Genre
ISBN

Download Cultural Resources Assessment of the Kenetech Windpower's Washington Windplant No.1 Project, Klickitat County, Washington. Appendix D to Washington Windplant No.1 EIS. Draft Report Book in PDF, Epub and Kindle

Government Reports Announcements & Index

Government Reports Announcements & Index
Title Government Reports Announcements & Index PDF eBook
Author
Publisher
Pages 728
Release 1995
Genre Science
ISBN

Download Government Reports Announcements & Index Book in PDF, Epub and Kindle

Washington Windplant No.1, 115 Megawatt Windpower Project, Klickitat County

Washington Windplant No.1, 115 Megawatt Windpower Project, Klickitat County
Title Washington Windplant No.1, 115 Megawatt Windpower Project, Klickitat County PDF eBook
Author
Publisher
Pages 342
Release 1995
Genre
ISBN

Download Washington Windplant No.1, 115 Megawatt Windpower Project, Klickitat County Book in PDF, Epub and Kindle

Proposed Columbia Wind Farm No. 1

Proposed Columbia Wind Farm No. 1
Title Proposed Columbia Wind Farm No. 1 PDF eBook
Author
Publisher
Pages 255
Release 1995
Genre
ISBN

Download Proposed Columbia Wind Farm No. 1 Book in PDF, Epub and Kindle

This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm {number_sign}1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided by RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue.